SHPO, Madison, WI.
No description specified.
151-200 (283 Records)
Documents
- Cultural Resource Survey Chequamegon National Forest: 1983
- Cultural Resource Survey Chequamegon National Forest: 1983
- Cultural Resource Survey Chequamegon National Forest: 1983
- Cultural Resource Survey of Three Proposed Residential Parks at Onalaska (1980)
- Cultural Resources Assessment Survey of Four Sites at Herbster and One At Cornucopia, Wisconsin (1980)
- Cultural Resources Inventory for a Small-Boat Harbor, Trempealeau, Trempealeau County, Wisconsin (1982)
- Cultural Resources Investigation of the State Road and Ebner Coulee Project (1980)
- Cultural Resources of the Upper Mississippi Valley: Guttenberg, Iowa To Saverton, Missouri. Two Volumes. Iowa State Historical Department, Division of Historic Preservation (1978)
- Cultural Resources Survey Report (Prepared for Exxon Minerals Co., USA) (1979)
- Description of Artifacts From the Blank Site (47-Ch-52) (1982)
- Driftless Area Archaeology: a Progress Report (1971)
- Driftless Area Archaeology: a Progress Report (1971)
- Driftless Area Archaeology: a Progress Report (1971)
- Excavations at Tower Hill State Park: the Southwest Corner Site (1972)
- Field Reconnaissance of the Franklin-Muskego Interceptor Route, Second Addendum - November 1979 (1979)
- Final Archaeological Survey Report - Zone II Borrow Areas for the Halls Creek Dam - Florence County, Wisconsin (1976)
- Final Report - Cultural Resources Investigations at Goose Island, Vernon County, Wisconsin (1982)
- Final Report - Cultural Resources Investigations for the State Road and Ebner Coulee Flood Control Project, La Crosse, Wisconsin (1981)
- Final Report of an Archaeological Survey at Whitefish Dunes State Park, Door County, Wisconsin (1979)
- Final Report of an Archaeological Survey of Johnston Park, City of Oak Creek, Wisconsin (1979)
- Final Report of an Archaeological Survey of the Pike Lake Beach Development (1979)
- Final Report of Archaeological Survey of the Immediate Environs of the Proposed Tyrone Power Plant, Dunn County, Wisconsin (1973)
- Final Report On the Initial Phases of Predictive Model Development for Aboriginal Cultural Resources On the Chequamegon National Forest, Wisconsin
- Final Report On the Initial Phases of Predictive Model Development for Aboriginal Cultural Resources On the Chequamegon National Forest, Wisconsin
- Final Report On the Intitial Phases of Predictive Model Development for Aboriginal Cultural Resources On the Chequamegon National Forest, Wisconsin
- Further Investigations of Two Areas Near Lake Marinuka, Galesville, Wisconsin (1979)
- Geomorphic Study of Pool 10 Upper Mississippi River Basin
- Identification and Evaluation of Logging Industry - Related Cultural Resources, Nicolet National Forest, Wisconsin (1982)
- Impacts On Cultural Resources. Chapters Six in Impacts of Navigation On Recreation, Potential Wilderness, and Cultural Resources (Technical Report G, Comprehensive Master Plan for the Management of the Upper Mississippi River System)
- Intensive Archaeological Testing and Evaluation of a Project in Permit Application By the Kohler Company, Sheboygan County, Wisconsin (1981)
- Intensive Cultural Resources Survey of the Michigan-Wisconsin Pipeline Company's Proposed 4" Gas Pipeline, Marinette County, Wisconsin (1982)
- Investigation of Cultural Resource Potentials in Areas of Proposed Harbor Projects, Erosion Control Projects, and Creek Rerouting In Ashland, Port Wing, Saxon Harbor, and Washburn, Wisconsin (1978)
- Investigation of Cultural Resource Potentials in Areas of Proposed Harbor Projects, Erosion Control Projects, and Creek Rerouting In Ashland, Port Wing, Saxon Harbor, and Washburn, Wisconsin (1978)
- La Crosse Area Archaeological Survey, 1979 Season (1980)
- Leter, Re: Archaeological Survey of Hickory Knoll Subdivision Sewer Extension (1981)
- Letter Detailing Results of Archaeological Survey Along Route of Proposed Interceptor Sewer in Brookfield (1980)
- Letter Detailing Results of Archaeological Survey of Lake Winnebago Breakwater and Pier at Wheeler Point (1980)
- Letter Indicating Results of Archaeological Inventory of Presque Isle Park Development Project, Vilas County, Wisconsin (1980)
- Letter Regarding the Survey of Cliffside Park, Racine Co (1977)
- Letter To Mr. Edward R. James, Regarding Friedman Estate (1978)
- Letter To Mr. Robert Miller, Regarding Vulcan Street Power Plant Site On Grand Shute Island, Appleton (1978)
- Letter, Re: Trimborn Farm Development, Village of Greendale (1982)
- Letter, Regarding A.C. Hanson Park Development (1981)
- Letter, Regarding East River Pedestrian Bridge, Green Bay (1977)
- Letter, Regarding Test Excavations at the Porte Des Morts Site (1983)
- Literature and Records Search On the Cultural Resources of the Portage, Wisconsin Area (1980)
- Literature Search for Archaeological Remains: Wisconsin Utilities Project, Appendix C (1973)
- Memo Concerning Results of Field Checks at Two Proposed Riprap Project Areas in Green County (1979)
- Paleo-Indians of East Central Wisconsin: a 1984 Survey and Test (1985)
- Paleo-Indians of East Central Wisconsin: a 1984 Survey and Test (1985)