Diana Pinto No description specified. 1-1 (1 Record) Documents Methods, Fieldwork Results and Interpretation of Archaeological Sites Affected By Construction and Operation of Thge Imperial Irrigation District Coachella-Midway - East Mesa 230-KV Transmission Line Project, Riverside and Imperial Counties (1989)