FERC
No description specified.
351-370 (370 Records)
Documents
- Revised Inventory of Known Cultural Resources Within or Adjecent to the Proposed Champlain Pipeline Corridors: Vermont (1989)
- The Roger Mills Expansion Project: An Archaeological Investigation for Northern Natural Gas Pipeline Company, a Division of ENRON Gas Pipeline Operating Co., in Gray, Roberts, and Wheeler Counties Texas (1990)
- Sheldon Cogeneration Plant / Phase I Archeological Site Identification Study and Phase II Evaluation Study of VT-FR-219 (1991)
- A Short Report of an Archaeological Survey of a 350 Foot by 380 Foot Relocated Dewatering Pit and 500 Foot by 600 Foot Staging Area Associated iwth the EPNG Proposed Samalayuca Pipeline Project in El Paso County, Texas (1997)
- The St. Lawrence-FDR Power Project, Synthesis of 1987-1996 Phase 1A Literature Reviews and Archeological Field Reconnaissance, Towns of Lisbon, Waddington, Louisville and Massena, St. Lawrence County, New York (2000)
- The St. Lawrence-FDR Power Project: Phase 1A Literature Review and Archeological Sensitivity Assessment, 500-Foot Buffer, Lisbon, Waddington, Louisville and Massena, St. Lawrence County, New York (2001)
- The St. Lawrence-FDR Power Project: Phase 1A Literature Review and Archeological Sensitivity Assessment, Akwesasne Buffer, St. Lawrence & Franklin Counties, New York, and Huntingdon County, Quebec (2001)
- Stage 1 A / B Cultural Resource Investigation: Proposed Natural Gas Pipeline Route Nym-106, Towns of Cohocton and Prattsburg, Steuben County, New York (2000)
- Stage IA and IB Archeology Report for Tennessee Gas Pipeline's 12.2 Mile Section 249 of the Eep 2000 Project, Mileposts 230C to 230B-203+57, in Erie and Niagara Counties (1999)
- Stage IA and IB Cultural Resources Report for Tennessee Gas Pipeline Company's Stagecoach Expansion Project in Tioga and Westchester Counties, New York (1999)
- Summary Report, Phase 1A Acrchaeological Survey, Keuka Hydroelectric, Project Town of Tyrone, Schuyler County, Town of Wayne, Town of Bradford, Steuben County, New York (2001)
- Summary Report: Results of a Cultural Resources Survey of an 8 Inch Gas Transmission Line Reroute Corridor, Rusk County, Texas. (1992)
- Suplement 6 to Phase 1B Archaeological Investigation, Stagecoach Storage Project, Town of Owego and Town of Nichols, Tioga County, New York (2001)
- Supplement 4 to Phase IB Archaeological Investigation, Stagecoach Storage Project, Town of Owego and Town of Nichols, Tioga County, New York (2001)
- Supplement 5 to Phase 1B Archaeological Investigation, Stagecoach Storage Project, Town of Owego and Town of Nichols, Tioga County, New York (2001)
- Supplemental Cultural Resource Survey of the FERC Shallow Water Route (Modified Route F5.32) for the Proposed Eastchester Marine Pipeline, Suffolk and Bronx Counties, New York (2002)
- Supplemental Cultural Resource Survey of the Throgs Neck Alternative for He Proposed Eastchester Marine Pipeline, Suffolk and Bronx Counties, New York { **Note: Includes Marine Testing and 1A Info for Terresterrial Route} (2000)
- Survey of I. c. Williamson Well No. 2 Pipeline, Natural Gas Pipeline Company of America (1986)
- Temporary Construction Areas Essex 19 Rehabilitation Project Green Mountain Power Corporation / Phase IB Archaeological Investigation (1995)
- Test Excavations in the Fayette to Lytton Springs Transmission Corridor, Bastrop and Fayette Counties, Texas (1980)