John Hartley
No description specified.
51-78 (78 Records)
Documents
- Bridge Replacement Over Snake Creek Tributary, Tulsa County, BRO-72D(368)CO (1995)
- Bridge Replacement Over Turkey Creek, Woods County, BRO-76(104)C (1992)
- Cultural Resorces Survey of a Western Farmers Electric Cooperative Proposed 138 Ku H-Frame Transmission Line Reroute, McCurtain County, Oklahoma (1996)
- Cultural Resources Survey of the Western Farmers Electric Cooperative Proposed Canute Substation and H Frame Radial Transmission Line, Washita County, Oklahoma. (1997)
- Cultural Resources Survey of Western Farmers Electric Cooperative Proposed Cache Substation at H-Frame Transmission Line, Comanche County, Oklahoma. (1998)
- Cultural Resources Survey of Western Farmers Electric Cooperative Proposed Hammett Tap H-Frame Transmission Line, Lincoln County, Oklahoma. (1999)
- Cultural Resources Survey of Western Farmers Electric Cooperative Proposed TXI Substation, Bryan County, Oklahoma. (1999)
- Cultural Resources Survey of Western Farmers Electric Cooperative Proposed West Moore Substation and 1 Mile Radial Transmission Line, Cleveland County, Oklahoma. (1998)
- Cultural Resources Survey of Western Farmers Electric Cooperative ProposedCuster Substation and H-Frame Line Custer County, Oklahoma. (1998)
- Cultural Resources Survey of Western Farmers Electric Cooperative Warren Valley Substation and Transmission Line, Noble County, Oklahoma (1997)
- Cultural Resources Survey of Wright Group Hinton Travel Plaza Rural Economic Development Fund Application, Caddo County, Oklahoma. (2000)
- Cultural Resources Survey, Western Farmers Electric Cooperative 138KV H-Frame Transmission Line, McCurtain County (1995)
- Highway Imrovements, Tillman County, STP-71B(137); STP-71B(142); BRF-71B(129); STP-71B(143); 13771(04); 13772(04); 13773(05); 13405(04); 13773(06) (1994)
- Letter Report. (1999)
- Northwest Pipeline Corporation's Tie To Fork Unit 6-1-2-2, Rio Blanco County, Colorado (1983)
- ODOT Bridge Replacement BRS-5419(100)C Pedestrian Survey, Okfuskee County, Oklahoma. (1987)
- ODOT County Road Improvement, RS-6126(100)C (1989)
- Phase 1 Cultural Resources Review Proposed Reconstruction of SH33, I-35 to Cushing, Logan, and Payne Counties, Oklahoma. (1997)
- Phase I Cultural Resources Review Proposed Reconstruction of SH-99 from SH-56 to Existing 4-Lane Facility South of Seminole, Seminole County, Oklahoma. (2000)
- Preliminary Report On Test Excavations At 34NB68: a Late 19th and Early 20th Century Structure On Otoc-Missouri Trust Lands, Noble County, Oklahoma (1996)
- Preliminary Test Excavations At Archaeological Site 34PW195, Pawnee County, Oklahoma (1997)
- Preliminary Test Excavations At Site 34KA142 In the Proposed Standing Bear Native American Memorial Park, Kay County, Oklahoma (1996)
- Proposed Bridge Replacement Over Bitter Creek, Kay County, Oklahoma (1999)
- Proposed Northwest By-Pass for Tahlequah, Linking SH 51 and SH 82, Cherokee County, Oklahoma (1998)
- Road Reconstruction, Tulsa County, NH-15(225)EC (1994)
- SH 48 Bridge Replacement Over Leader Creek and Shoofly Detour, Pontotoc County, BRO-62(210) (1992)
- Survey of Access Reroutes for the Wolf Creek Reservoir Feasibility Study, Rio Blanco County, Colorado (1983)
- Ten Test Cones and Access Routes for Wolf Creek Reservoir Feasibility Study, Rio Blanco County, Colorado (1983)