BLM, Elko, NV
No description specified.
601-650 (707 Records)
Documents
- Emigrant Springs Gravel Pit (1981)
- Fenelon Road Reroute and Gravel Pit: Cultural Resources Report BLM 1-478(P) (1982)
- Final Report On the Elko To Carlin Transmission Line, Cultural Resource Inventory (1984)
- Further Archaeological Investigation of the Dahl-BLM Land Exchange Parcel, Elko County, Nevada (1984)
- Fy-79 Mori Amp Water Developments (1978)
- Glaser Land Exchange: Cr Report: BLM 1-789 (P) (1984)
- Gully-Buckhorn Fence Maintenance and Alignment: Cultural Resource Inventory Report # BLM 1-550(P) (1982)
- Historical & Archaeological Survey Report: East Elko Material Source Pit No. El82-1 (E.A. 70743-0) (1979)
- Historical and Archaeological Cultural Resources Report: Roadside Betterment and Safety Work Along S.R. 46 from Milepost S.R. 46-El-2 To S.R. 46-El-6.86 (1979)
- Historical and Archaeological Cultural Resources Report: Survey of Haul Road Between SE 51 and Quarry, Eu 08-2 (1979)
- I-080-3(4)388, 70071, I-80 from 15 M E Pequop Summit East To Utah Line, Historical & Archaeological Reconn., Material Site Exploration (1975)
- I-80-5 (4) 3880, I-80 from 15 Me of Pequop Summit To Utah Line, 70071, NAS #65 (1975)
- Indian Basin Spring Development: Cultural Resources Report BLM 1-711(P) (1984)
- Interim Report On an Archaeological Survey for Strata Search, Inc., Near Elko, Nevada (1984)
- Jackpot Public Lands Sale N-38086: Cultural Resources Report BLM 1-599(P) (1983)
- Jackpot Sewage Lagoon (N-13080) (1978)
- Joseph R. Payne Land Sale: Cultural Resources Report, BLM 1-679(P) (1984)
- Knoll Creek Phone and Powerline and Toano Well No. 1 Powerline: Cultural Resource Report BLM 1-556(P) (1982)
- Letter To Mr. Laurnal Gubler Regarding a Crew from the Dri Division of the Nevada Archaeological Survey Conducting an Archeological and Historical Survey of the Wells Section of I-80 (1975)
- Letter To Tim Murphy Regarding Archaeological Clearance of Approximately 6.25 Miles of Proposed Geophysical Line for Arco Explorations Induced Polarization Survey (1983)
- Lower Camp Pipeline, Cr Report: BLM 1-44 (P) (1975)
- Lower Deer Springs, Cr Report: BLM 1-47 (P) (1975)
- Mahala Creek Well Site - Ladd Petroleum, NAS #132-C (1976)
- Maverick Springs Pipeline and Maverick Springs Fence Projects: Cultural Resource Report BLM 1-557(P) (1982)
- MC Cee Cee Gap Fence: Cultural Resources Report BLM 1-632(P) (1983)
- McCormick Spring Developments: Horse Creek Spring, Section 15 Reservoir, Antelope Basin Reservoir and Hanks Creek Spring: Cultural Resources Report BLM 1-653 (1983)
- Memo: Cultural Resource Inventories of Dle Applications N22317, N22298, N21755, N23318, N23404, N23018, N23376, N23375, N24128 and N24192 (1981)
- Memo: Cultural Resource Inventory and Recommended Mitigation of Impacts To Cultural Resources On Dle 33221 (1981)
- Memorandum To Linda Armentrout, District Archeologist: Cold Springs Water Development (1977)
- Memorandum To Pony Express Resource Area Manager Regarding Cruise Missile Hamot Location (1981)
- Mound Valley Pipeline, Cr Report: BLM 1-49 (N) (1975)
- Mound Valley Well (Proj. #4722) (1975)
- N-11194, Wells Rural Electric Power Transmission Right-Of-Way, Cr Report #: BLM 1-26 (P) (1975)
- North Maverick Fence: Cultural Resources Report BLM 1-596(P) (1983)
- Note To File: Sites On Pilot Peak (1981)
- Note To Files: Map Plot and Photo of the Shelter We Found While Surveying Sec. 12 (1987)
- Notice of Intent To Conduct Mineral Exploration On the Tc Claims (NV-010-04-82) (1981)
- Nshd Material Site for Sr51 (El 22-1), Cr Survey Report # 1-235 (P) (1979)
- O'Neil Basin Spring Developments (Dry Creek Spring Pipeline, Lower Dry Creek Spring Pipeline, Mud Spring Pipeline, and Unnamed Reservoir) Cultural Resource Report BLM 1-558(P) (1982)
- Odgers Fence #2, Project #4740 (1975)
- Odgers Well, Cr Report: BLM 1-57 (N) (1975)
- Outhouse Draw Pipeline (Proj. #4756) (1975)
- Outhouse Fence, Cr Report: BLM 1-29 (N) (1975)
- Palomino Pipeline (Project #4762) (1975)
- Paris Boundary Line Fence: Cultural Resources Report BLM 1-611(P) (1983)
- Pie Creek Extension, Cr Report: BLM 1-54 (P) (1975)
- Pie Creek Pipeline, Cr Report 1-38 (P) (1975)
- Pilot Valley Estates Unit No. 1. Access Road (1982)
- Pinyon Pipeline, Cr Report: BLM 1-41 (P) (1975)
- Polar Star Pipeline: Cultural Resources Report BLM 1-514(P): a 1 1 / 8 Mile Pipeline With a Single Cattle Through and Over Flow Pond Are To Be Constructed (1982)