Peter A. Thomas
No description specified.
1-50 (154 Records)
Documents
- Archaeological and Geomorphological Evaluation: Burlington M5000(3) Northern Connector Material Supply / Disposal Area, Howe Farm Floodplain (1985)
- Archaeological and Historical Impact State, Tyler Dam Site, Northboro-Marlboro, Massachusetts, Suasco Watershed Project
- Archaeological and Historical Impact State, West Branch of the Westfield River Watershed; Hampden, Berkshire and Hampshire Counties; Chester, Becket, Middlefield and Washington, Massachusetts (1976)
- Archaeological and Historical Survey, Clam River Watershed Project: Clam Lake Multiple-Purpose Dam, Sandisfield, Massachusetts (1974)
- Archaeological Management Plan, Russell Training Area, Shoreham, Vermont (1987)
- Archaeological Reconnaissance and Intensive Site Evaluation Report for the Proposed Route 4 Bypass: West Rutland-Rutland F020-1(10) (1983)
- Archaeological Reconnaissance for Moretown RS 0167(11), Moretown, Vermont (1986)
- Archaeological Reconnaissance Survey and Site Evaluation Study for the Yellow-Blue-Yellow Alignment, Chittenden County Circumferential Highway, 1984-1985, Volume V: Technical Data For Sampling Areas and Archaeological Sites (1985)
- Archaeological Reconnaissance Survey and Site Evaluation Study for the Yellow-Blue-Yellow Alignment, Chittenden County Circumferential Highway, 1984-1986, Volume VI: Technical Appendices (1986)
- Archaeological Reconnaissance Survey and Site Evaluation Study for the Yellow-Blue-Yellow Alignment, Chittenden County Circumferential Highway, 1984-1986: Volume IV: Project Description, Background Studies, Sampling Approaches, and Manage (1986)
- Archaeological Reconnaissance Survey for Essex-Williston BRZ 1445(123) (1991)
- Archaeological Reconnaissance Survey for Essex-Williston BRZ 1445(13), Essex and Williston, VT ADDENDUM. CAP Report No. 110 (1991)
- Archaeological Reconnaissance Survey for Essex-Williston BRZ 1445(13). (1991)
- Archaeological Reconnaissance Survey for the Chittenden County Circumferential Highway Volume 1, 2, & 3 (1985)
- Archaeological Reconnaissance Survey for Woodstock Bhs 0151(9)S, Woodstock, Vermont (1986)
- Archaeological Reconnaissance Survey for Woodstock Brs 0151(8)S, Woodstock, Vermont (1986)
- Archaeological Reconnaissance Survey of Plymouth State Park, Plymouth, Windsor County, Vermont (1985)
- Archaeological Reconnaissance Survey, Cornwall RS 0172(4) (1986)
- Archaeological Reconnaissance Survey, Highgate the 2410 (1986)
- Archaeological Reconnaissance Survey, Palmer Development Parcel, Kimball Avenue, South Burlington (1986)
- Archaeological Resource Management Study Lemon Fair River Watershed (1982)
- Archaeological Resource Management Study Lower Winooski River Watershed (1981)
- Archaeological Resource Management Study: Lower Otter and Dead Creeks Watershed (1980)
- Archaeological Resource Management Survey Black River Watershed Orleans County, Vermont (1981)
- Archaeological Review of Proposed Recreation Facilities for the Lamoille River Hydroelectric Development, FERC Number 2205 (1985)
- Archaeological Site Identification and Evaluation Bristol BRF 021-1(13) RT. 116 Bridge Replacements (1992)
- Archaeological Site Identification and Evaluation for Shelburne Business Park. CAP Report No. 96 (1989)
- Archaeological Survey, Upper Factory Multiple-Purpose Dam and Adjacent Area, Middlefield and Peru, Massachusetts (1974)
- Archaeological View of Vermont's Past
- Archeological and Geomorphological Evaluation (Phase I), Burlington M5000(3), Northern Connector, Material Supply / Disposal Area, Howe Farm Floodplain. (1985)
- Archeological Considerations Relative To the Upper Castleton River Watershed Rechannelization Project (1983)
- Archeological Management Plan, Russell Training Area (1987)
- Archeological Reconnaissance Survey - Taft's Farm (1987)
- Archeological Reconnaissance Survey for Chittenden County Circumferential Highway. Vol. I: Project Description, Background Studies, Sampling Approaches and Management Summary. (1985)
- Archeological Reconnaissance Survey for Chittenden County Circumferential Highway. Vol. II: Project Description, Background Studies, Sampling Approaches and Management Summary. (1985)
- Archeological Reconnaissance Survey for Two Segments of the Quebec-New England Hvdc Interconnection, Bloomfield, Vermont (1983)
- Archeological Reconnaissance Survey of Pine Grove Terrace. (1988)
- Archeological Reconnaissance Survey of Two Areas in Button Bay State Park. (1985)
- Archeological Reconnaissance Survey To Evaluate the Sensitivity of an Area To Be Used for a 40 X 24 Ft. Picnic Shelter, One at Kare (St. Albans) and One At Bomoseen (Cstleton) State Park (1984)
- Archeological Survey of Water Pollution Control Facilities, Sherburne, Vermont Fire District #1 Phase I: Archaeological Reconnaissance Survey (1979)
- Ball Mountain Dam Hydroelectric Project West River Basin Energy Committee Reconnaissance Survey for Prehistoric and Historic Archaeological Resources (1982)
- Bellows Free Academy Proposed Sports Fields Site Identification Survey Report No. 240 (1999)
- Bethel, Vermont, Wastewater Treatment Facility: Phase I Assessment for Prehistoric and Historic Archaeological Sites (1980)
- Black River Hydroelectric Project: Phase 1B Archaeological Survey (1979)
- Brandon Brs 0158(1): Phase I and II Archaeological Assessment (1979)
- Burlington M5000(3)--Howe Farm Archaeological Report (1983)
- Burlington-Colchester M 5000 (3): Phase I Archaeological Report (1978)
- Burlington-Colchester M5000(3) Connector: Phase II Intensive Archaeological Survey (1979)
- Chace Mill Hydroelectric Project: Phase I and II Archaeological Assessment (1979)
- Comments On Recent Trends in Vermont Archeology (1980)