Charles E. Bolian
No description specified.
1-31 (31 Records)
Documents
- Archaeological Assessment of Barrington-Rochester Contract #F-019(10) and S-2095-a (Route N.H. 125) (1979)
- Archaeological Assessment of Chichester-Pittsfield (Webster Mills Road) (1980)
- Archaeological Assessment of Fort Washington, Portsmouth, New Hampshire
- Archaeological Assessment of Hart's Location (Br-F-031-1(12) P-2661)
- Archaeological Assessment of I-393, Concord: I-393-2(80)39, P-4809, (I-393) (1981)
- Archaeological Assessment of Raymond-Canadia Rt. 101 Relocation Project No. P-7959 (1983)
- Archaeological Assessment of Raymond-Candia Rt. 101 Relocation (1976)
- Archaeological Assessment of the Barrington-Rochester Route 125 Highway Corridor: Phase II (1979)
- Archaeological Assessment of the Brentwood-Exeter (Route 101) Highway Improvement Project (1979)
- Archaeological Assessment of the Dublin-Harrisville Route 101 Bypass (X-161Y) (1981)
- Archaeological Assessment of the Jackson Highway Project (1979)
- Archaeological Assessment of the North Walpole, New Hampshire - Bellows Falls, Vermont, Bridge Replacement (1979)
- Archaeological Assessment of the North Walpole, New Hampshire - Bellows, Falls, Vermont, Bridge Replacement (1979)
- Archaeological Assessment of the Ricker Grove Elderly Housing Project (1979)
- Archaeological Assessment of the Route 18 Bridge Across the Connecticut River from Littleton, NH, To Waterford, VT (1979)
- Archaeological Assessment of the Seabrook Boat Ramp Location (1978)
- Archaeological Assessment of the Tamworth Highway Project (Route 25) (1980)
- Archaeological Assessment of the Winnipesaukee River Basin (1976)
- Archaeological Assessment of Victory Parking Lot (1976)
- Archaeological Assessment: Winnisquam Regional School Ball Fields (1978)
- Background Research for an Archaeological Assessment of Kingston Pines (1980)
- Cultural Resource Survey of the Great Meadows National Wildlife Refuge, Massachusetts (1982)
- Draft Phase III Site Evaluation and Photographic Documentation of the Upper Factory Site, Dover, New Hampshire (1986)
- Phase 1 / 2 Cultural Resource Assessment of the Upper Factory Site, Dover, New Hampshire (1986)
- Phase I Archaeological Assessment of Interstate 393 Extension: Concord P-4809 (1979)
- Phase I Archaeological Assessment of the Moore's Falls Hydroelectric Project (1980)
- Phase II Archaeological Assessment of the Tilton - Belmont Sos-451(1) T-3233 (Jamestown Road) (1979)
- Preliminary Examination of Tilton-Belmont Site (Jamestown Road Over Winnipesaukee River) (1979)
- Proposal for an Archaeological Survey of the Upper Factory Hydroelectric Project (1986)
- Tamworth, Route 25, Relocation: F-024-1(2) / P-1889, Phase IV Archaeological Assessment (1981)
- Weirs Beach: a Preliminary Report of the 1976 Excavations (1977)