Applied Conservation Technology, Inc.
No description specified.
1-33 (33 Records)
Documents
- Archaeological Assessment of the Gold Mountain Memorial Park, Inc., Property, Baldwin Lake, California (1981)
- Archaeological Investigations of Access Roads Outside the Right-Of-Way In Dutch Division (1984)
- Archaeological Investigations On Modified Right-0f-Way Sections In Dutch Division And Access Roads Outside the Right-of-Way For The Benches, Pole, Moapa, and Arrowhead Divisions (1984)
- City of Los Angeles Department of Water and Power Vincent Substation Loop-In Project Cultural Resource Records Check and Field Survey Results (1986)
- City of Los Angeles, Department of Water and Power Sylmar Expansion Project Cultural Resources Records Check and Field Survey (1984)
- Class III Cultural Resource Survey Intermountain Power Project (Ipp) Inter-Mtn-Adelanto Ripde I R / W (1982)
- Class III Cultural Resource Survey Intermountain Power Project (Ipp)Intermountain-Adelanto Bipole I Transmission Line, Right-Of-Way California Section (1982)
- Class III Cultural Resource Survey: Intermountain Power Project (Ipp), Intermountain - Adelanto Bipole I Transmission Line, Right-Of-Way, California Section (1982)
- Confidential Archaeological Site Appendix: Paniktum Hemki: a Study of Cahuilla Cultural Resources in Andreas and Murray Canyons (1983)
- Cultural Resource Survey: Mission Zanja Creek Flood Control Project, Redlands, California (1985)
- Cultural Resource Survey: Proposed Kern River Field Cogeneration Project (1982)
- Cultural Resources Literature Search, Records Check and Sample Field Survey for the California Portion of the Celeron / All American Pipeline Project (1984)
- Cultural Resources Literature Search, Records Check and Sample Field Survey for the California Portion of the Celeron / All American Pipeline Project: Technical Appendix To: Draft Environmental Impact Report / Proposed Celeron / All American and (1984)
- Draft Report: Preliminary Archaeological Testing Results at Prehistoric Kavinish (CA-Riv-2935) (1985)
- Final Report: Mira Loma-Serrano 500 Kv DC and Serrano-Villa Park 220 Kv Transmission Line Project (1983)
- Final: Technical Synthesis Report, Cultural Resource Survey Results Proposed Mission Creek and Vicinity Flood Control Study (1985)
- Intermountain Power Project (Ipp) Microwave Loop Extension Project Cultural Resource Records Check and Field Survey Results Final (1986)
- Intermountain Power Project (Ipp) Phase II, Microwave Communications Systemarchaeological and Historical Resources Inventory and Significance Evaluation, Final Report (1982)
- Intermountain Power Project (Ipp): the Cultural Resources Studies of the Coyote Ground Electrode Project at Coyote Lake, San Bernardino County, California (1986)
- Intermountain Power Project Documentation For "No Adverse Effect" Determination At Scout's Shelter 26CK3023, Intermountain-Adelanto Transmission Line Right-of-Way Nevada Section (1984)
- Intermountain Power Project Microwave Communication System, Phase I Archaeological and Historical Resources Inventory and Significance Evaluation (1981)
- Intermountain Power Project Mitigation Plan and Research Design for Data Recovery at Six Archaeological Sites Along the Intermountain-Adelanto Transmission Line 1 Right-Of-Way, California Section (1983)
- Intermountain Power Project Test-Level Archeological Investigations at CA-Sbr-263: a Preliminary Report (1983)
- Intermountain Power Project. Intermountain-Adelanto Bipole 1 Transmission Line, California: Ethnographic (Native American) Resources (1982)
- Mira Loma-Serrano 500 Kv DC and Serrano-Villa Park 220 Kv Transmission Line Project - Final Report, Cultural Resource Survey and Test Excavations at Ora-614, Sbr-3690, and Sbr-4032 (1983)
- Pacific Intertie Hvdc Upgrade Cultural Resource Survey Results (1985)
- Prehistoric Cultural Resource Investigations: Southern California Edison Lucerne Valley Project, Summary Report (1979)
- Results of an Intensive Cultural Resources Survey of a 40 Acre Tract Around the Ludlow Heater Station (1989)
- Results of Archaeological Investigations Along the Nevada Section of The Proposed Intermountain Power Project (IPP) Intermountain-Adelanto Line 1 (Revised) (1983)
- Results of Cultural Resource Survey, Inventory and Avoidance Planning for the Continental Telephone Company Buried Fiber-Optics Cable Project Lee Vining To Mammoth Lakes (1986)
- Results of Cultural Resources Investigations of the Access Roads Outside The Right-0f-Way For The Ivanpah and Kingston Divisions of The Intermountain Power Priject (IPP) Intermountain-Adelanto Line 1 in Nevada (1983)
- Sylmar Expansion Project Cultural Resource Inventory and Significance Evaluation Addendum To Final Report (1985)
- Tradition and Transmission: Prehistoric Stone Procurement and Tool Production in the Mojave Desert - Results of the Intermountain Power Project Data Recovery Program In California (1986)