J. Weisbord
No description specified.
1-5 (5 Records)
Documents
- Class III Cultural Resource Survey Intermountain Power Project (Ipp)Intermountain-Adelanto Bipole I Transmission Line, Right-Of-Way California Section (1982)
- Cultural Resources Literature Search, Records Check and Sample Field Survey for the California Portion of the Celeron / All American Pipeline Project: Technical Appendix To: Draft Environmental Impact Report / Proposed Celeron / All American and (1984)
- Draft Report: Preliminary Archaeological Testing Results at Prehistoric Kavinish (CA-Riv-2935) (1985)
- Mira Loma-Serrano 500 Kv DC and Serrano-Villa Park 220 Kv Transmission Line Project - Final Report, Cultural Resource Survey and Test Excavations at Ora-614, Sbr-3690, and Sbr-4032 (1983)
- Sylmar Expansion Project Cultural Resources Inventory and Significance Evaluation - Final Report (1985)