Office of Public Archaeology, University of Washington
No description specified.
251-295 (295 Records)
Documents
- Monitoring of Waterline Excavation On Archaeological Site 45-CA-23 To Ensure That No Human Burials Were Disturbed (1978)
- Native American Religious Freedoms Act: a Report for the Proposed Sandy Creek Hydroelectric Development (1982)
- On-Site Archaeological Assessment Monroe Development Company Site (1978)
- On-Site Archaeological Assessment of Proposed North Creek Center Development (1978)
- Overview of Prehistoric and Historic Resources for the 132nd S.E. Roadway Improvement and Extension Project (1978)
- Point Roberts Marina Archaeological Investigations (1976)
- Port Gamble Indian Reservation, T28N / R2E / Sections 5 Ne4, Se4, Sw4, Section 8 Ne4 & Se4, Section 17 Ne4 & Se4 (1979)
- Preliminary Archaeological Assessment and Literature Search Pertaining To 45-CA-277 and the Immediate Vicinity (1980)
- Preliminary Archaeological Assessment for the Honeywell Marine Systems Operations (1982)
- Preliminary Archaeological Assessment of Proposed Keyport Trace Subdivision (1978)
- Preliminary Archaeological Assessment of Proposed Sno-King Residential Subdivision (1978)
- Preliminary Archaeological Assessment of the Planned Padden Expressway Interchange from I-205 and 83rd Street To 94th Avenue, Clark County, Washington (1979)
- Preliminary Archaeological Assessment Penn Cove Marina Facilities (1977)
- Preliminary Archaeological Assessment Proposed North Creek Center Development (1978)
- Preliminary Archaeological Assessment Proposed Poulsbo Car Dealership (1977)
- Preliminary Archaeological Assessment San Juan - Henry Island Submarine Cable Crossing (1977)
- Preliminary Archaeological Assessment Silver Firs / Snohomish Cascade Community Development (1978)
- Preliminary Archaeological Assessment Trident Base Access Study (1977)
- Preliminary Archaeological Assessment Tulalip Indian Reservation (1976)
- Preliminary Archaeological Assessment Wing Point Country Club North (1978)
- Preliminary Archaeological Assessment, Town of Granite Falls, Sewage Treatment Facilities (1976)
- Preliminary Archaeological Reconnaissance of Sr 520: 108th Avenue N.E. Transit Access Ramp, King County (1983)
- Preliminary Archaeological Reconnaissance of Sr2, Snohomish To Monroe (1977)
- Preliminary Report of Archaeological Investigations at the Shores East Condominiums Development, Bremerton, Washington (1983)
- Premature Subsurface Disturbance Associated With Vault Toilet Excavation at Birch Bay State Park (1986)
- Progress Report of an Archaeological Investigation of Western State Hospital Phase I Construction Area (1980)
- Progress Report On the Archaeological Assessment of the Proposed Quilcene National Fish Hatchery Alterations, Jefferson County, WA (1983)
- Proposed Bridge Across the North Fork of the Sultan River: Preliminary Archaeological Assessment (1978)
- Proposed Subdivision of Orcas Island Yacht Club Property (1983)
- Recommended Mitigative Action for Archaeological Resources Proposed Sr2-Fobes Hill To North Monroe Interchange (1978)
- Report of Archaeological Assessment of the Proposed Earlington Woods Development, Renton, Washington (1979)
- Report of Archaeological Reconnaissance Along Bpa's Maple Valley Loop 500-Kv Transmission Line (1975)
- Research Design for the Chief Joseph Dam Cultural Resources Project (1984)
- Sammamish River Pedestrial Bridge and Trail at Bothell Washington, T26N R5E, NW 1 / 4 NW 1 / 4 Section 8 (1981)
- Seward Bridge Replacement Cultural Resource Reconnaissance, Clark County, Washington (1982)
- Sr 2: Burlington Northern Railroad Overcrossing 2 / 105, King County (1982)
- Sr 509 - Sr 99 Hov Lanes Project (1983)
- Sr5: Cowlitz River To Frost Road (1979)
- Sr5: Cowlitz River To Frost Road, Job No. L-5574, D.O.T. District 4 (1979)
- Subsurface Coring of Metro's Renton Sewage Treatment Plant (1980)
- Summary of Archaeological Investigations Skokomish Indian Reservation Tideland Margins (1979)
- Summary of Results, Chief Joseph Dam Cultural Resources Project, Washington (1984)
- Washington State Highways Archaeological Survey Annual Report, 1974 (1975)
- Wells Avenue Bridge Replacement, Renton, Washington (1983)
- White River Hydroelectric Project: Cultural Resource Assessment, Pierce County, Washington (1983)