Mark L. Papworth
No description specified.
1-5 (5 Records)
Documents
- Cultural Resource Evaluation of 1.1 Miles of 60 Foot Right-Of-Way for the Hoh Indian Reservation Jefferson, Washington Project Hir 100 (1) (1984)
- Cultural Resource Evaluation of Four Building Sites On the Evergreen State College Campus Known As Housing Phase (1986)
- Cultural Resource Evaluation of Proposed Timber Cutting Areas On the Tulalip Indian Reservation (1984)
- Cultural Resource Evaluation of Six Proposed Timber Cutting Areas and Two Proposed Housing-Related Sites, On the Lummi Indian Reservation (1984)
- Guide To Archaeological Excavations (1961)