Michael C. Gardner
No description specified.
1-16 (16 Records)
Documents
- Archaeological and Historical Survey of Vidal Geological Test Trenches (1974)
- Archaeological Impact Expected from the Tequesquite Arroyo-Box Springs Wash Flood Control Project (1971)
- Archaeological Impact of the Mabey Canyon Debris (1971)
- Arlington Channel Flood Control Project: Expected Impact On Archaeological Resources (1971)
- Calnev Pipeline Company Right-Of-Way Between Manix, California and the California / Nevada Border: Expected Impact To Archaeological / Paleontological Resources (1973)
- Further Archaeological Investigation of the Vidal II Geological Test Site in Eastern San Bernardino County, California (1972)
- Further Archaeological Investigations at Vidal II Geological Test Site in Southeastern San Bernardino County, California (1972)
- Golden Crest Residential Development: Expected Impact On Archaeological Resources (1973)
- Investigation of Prehistoric Milling Stations at Perris Reservoir, California (1973)
- Investigation of Prehistoric Milling Stations at the Perris Reservoir (1972)
- Lincolin Street Channel Stage II Flood Control Project: Expected Impact To Archaeological Resources (1973)
- Main Street Wasj Flood Control Project: Expected Impact To Archaeological Resources (1973)
- Mary Street Dam and Channels Flood Control Project: Expected Impact On Archaeological Resources (1971)
- Mitigation of Impact Created By Construction of the Calnev Pipeline Company, Fourteen Inch Pipeline from Las Vegas, Nevada To Manix, California (1973)
- Report of Preliminary Archaeological Reconnaissance of Vidal-Chemehuevi-Rice Htgr Transmission Lines (1972)
- Valle Vista Channel Flood Control Project: Expected Impact On Archaeological Resources (1973)