Caltrans, 09
No description specified.
1-50 (68 Records)
Documents
- Addendum Archaeological Survey Report for a Drainage Easement at Lost Cannon Creek. 09-Mno-395 P.M. 109.3 (1980)
- Archaeological Assistance for Sr 395 Pm 98.8 / 101.2 Walker River Passing Lanes (1983)
- Archaeological Survey of a Proposed Highway Expansion Project On 09-Iny-395 Inyo County (1979)
- Archaeological Survey Report for 09-Mno-395 P.M. 20.00 (1980)
- Archaeological Survey Report for a Drainage Easement at Lost Cannon (1979)
- Archaeological Survey Report for a Highway Reconstruction Project On 9-Iny-395-54.5 / 57.6 (1977)
- Archaeological Survey Report for a Proposed Northbound Right Hand Turn Lane 09-Mono-395, P.M. 69.35 (1980)
- Archaeological Survey Report for Highway Improvement Projects Between Big Pine and Bishop (1978)
- Archaeological Survey Report of a Proposed Highway Improvement Project Mono County (1980)
- Archaeology of CA-Iny-30: Prehistoric Culture Change in the Southern Owens Valley, California, Pm 45.0 / 55.1 (1988)
- Archeological Survey Along Highway 395 and Excavation of CA-Mno-389 (1980)
- Archeological Survey Report for Additional Passing Lanes On 9-Mno-395-86.7 / 88.5 Easterly of Devils Gate (1976)
- Archeological Survey Report for Proposed Bridge Replacement 09-Mno-395 P.M. 95.8 / 96.4 (1981)
- Archeological Survey Report for Proposed Material Site Location 09-Iny-190 P.M. 55.0 (1981)
- Archeological Survey Report for Proposed Roadside Rest Leachfield Expansion 09-Mno-395 P.M. 32.3 (1981)
- Archeological Survey Report for Proposed Southbound / Northbound Passing Lanes 09-Mno-395 P.M. 99 / 100, 104 / 105 (1980)
- Archeological Survey Report. Black Canyon Creek Stream Channelization Project. Adobe Valley. 9-Mno-120 Pm 44.60 / 45.66 (1987)
- Asr for a Bridge Replacement Project 09-Iny-136, Pm 2.4 / 2.8 (1984)
- Asr for a Proposed Chain-Up Area On Highway 395, Pm 59.8 (1983)
- Asr for a Proposed Highway Widening Project Along Highway 395, Mono County (1984)
- Asr for a Proposed Passing Lanes Project On Highway 395, P.M. 68.8 / 69.6 (1983)
- Assessment of Archaeological Resources Schober Lane South of Bishop To 4L-Lane Highway 395, Inyo County (1974)
- Assessment of Archeological Resources DOT Highway Project Casa Diablo To Wilson Butte, Mono County (1974)
- CA-Mno-833, an Obsidian Stoneworking Camp in Long Valley, Mono County (1986)
- Cultural Resource Assessment of County Road 1462 (1976)
- Cultural Resource Assessment of the Sherwin Summit Project, Highway 395 P.M. 8.3 To P.M. 9.9 Calif. Department of Transportation, District 9. Mono County, Calif (1975)
- Cultural Resource Assessment of the Sherwin Summit Project: Hwy 395, Mono County (1975)
- Extended Phase I Investigation at CA-Iny-2632 Near Summit Creek (1986)
- Final Report On Excavations AR CA-Iny-526, CA-Iny-504, CA-Iny-31, CA-Iny-33, and CA-Iny-352 (1975)
- Final Report: Phase II Archeological Investigations at 4-Mno-584 On Sherwin Grade 09-Mno-395 P.M. 8.3 / 9.9 (1976)
- First Addendum Archeological Survey Report for Proposed Southbound Passing Lane 09-Mno-395 P.M.98.5 / 99.0;100.0 / 101.2:99.0 / 100.0;104.0 / 105.0 (1981)
- First Supplemental Historic Property Survey Report for 9-Mno-395 P.M. R26.6 / 33.7 (1986)
- Hasr, 09-Iny-395 (1978)
- Historic Properties Survey Report Death Valley Maintance Station (1979)
- Historic Property Survey Report for Sage Flat Expressway Project 9-Iny-395 P.M. 25.9 / 31.2 (1987)
- Historic Property Survey Report for the Proposed Black Canyon Creek Channelization Project. 9-Mno-120 Pm 45.1 / 45.4 (1987)
- Historic Property Survey Report: 9-Mno-395 P.M. R26.6 / 30.0; and 9-Mno-395 P.M. 30.0 / 33.7 (1985)
- Hpsr for Sr 395, Pm 33.4 / 36.0 (1984)
- Initial Archeological Evaluation of CA-Iny-2146 09-Iny-395 P.M. 109.27 (1980)
- Investigation of CA-Mno-1982, a Piagi Procurement Site in Long Valley (1986)
- Nasr Addendum for Sr 203, Pm 5.8 / 8.6 (1984)
- Nasr Addendum Sr Inyo L5703 Parcel Acquisition for Maintenance Stations (1984)
- Nasr for Sr 158 Pm 0.0 / 3.0 (1983)
- Nasr for Sr 158 Pm 4.3 / 4.5, Trim Back Shoolbus Rock (1983)
- Nasr for Sr 170, Pm 12.0 / 14.6, Realignment of Highway Through Poison Canyon (1986)
- Nasr for Sr 182 Pm 7.0 (1986)
- Nasr for Sr 203 Pm 5.8 / 8.6 (1984)
- Nasr for Sr 203, Pm 5.8 / 8.6 (1983)
- Nasr for Sr 395 Pm 42.0 (1983)
- Nasr for Sr 395 Pm 51.6 / 52.9 (1983)