CT DOT
No description specified.
Institution Members
1-5 (5 Records)
Documents
- Archaeological Survey of I-86 Relocation Manchester-Vernon, Connecticut (1980)
- Final Report Archaeological Survey of Conn Rte. 108 - Meadow Street Intersection Shelton, Connecticut (1979)
- Northeast Corridor Improvement Program, Elimination of At-Grade Crossing, Groton, Connecticut, Project No. 59-109: Preliminary Case Report, Former West Mystic Railroad Station and Phase 1B Archeological Field Investigation (1979)
- Phase I Cultural Resources Survey: Latimer Point Road Grade Crossing Elimination Project, Town of Stonington, Connecticut (1978)
- Phase I Cultural Resources Survey: Wamphassuc Road Grade Crossing Elimination Project, Town of Stonington, Connecticut (1978)