Dept. of Anthropology, University of Vermont
No description specified.
51-99 (99 Records)
Documents
- Burlington M5000(3)--Howe Farm Archaeological Report (1983)
- Burlington-Colchester M5000(3) Connector: Phase II Intensive Archaeological Survey (1979)
- Chace Mill Hydroelectric Project: Phase I and II Archaeological Assessment (1979)
- Cultural Resource Management Study Ball Mountain Lake Jamaica and Londonderry, Vermont (1982)
- Cultural Resource Management Study North Springfield Lake Springfield and Weathersfield, Vermont (1982)
- Cultural Resource Management Study, Munson Borrow Pit, Williston, Vermont, Related To Williston-South Burlington BRM 5500(2)S and South Burlington M 5200(10)S (1986)
- Cultural Resource Management Study, North Hartland Lake, Hartland and Hartford, Vermont (1986)
- Cultural Resource Management Study, Townshend Lake, Townshend and Jamaica, Vermont (1986)
- Cultural Resource Reconnaissance for the Construction and Operation of the Missisquoi River Flood Control (and Hydroelectric) Project in Richford, Vermont (1982)
- Danville F028-3(13): Phase I Archaeological Assessment (1981)
- Enosburg Housing for the Elderly and Handicapped Phase I: Archeological Reconnaissance (1979)
- Exploratory Archaeological Excavations at the Ethan Allen Farmhouse (1979)
- Hartford, Vermont, Recreational Facility: Phase I Archaeological Assessment (1980)
- Highgate Converter Site (1985)
- Huntington Falls Hydroelectric Project Archaeological Survey (1986)
- Initial Study of the Prehistoric and Historic Archaeological Sensitivity of the Bennington Area. the Pownal-Bennington Highway Project: F019-1(4), F019-1(5), F012-1 (1979)
- Intensive Archaeological Evaluation for Selected Prehistoric Sites Within the Highgate Falls Hydroelectric Project Area and Prehistoric Archaeological District (1983)
- Interstate 91: Test Excavation of VT-CA-13 (the Warrell Farm Site), Report of the Project Supervisor (1976)
- John's Bridge Site: VT-Fr-69, Area I: Phase III Data Recovery Project Brs 0285(2) (1980)
- John's Bridge Site: VT-Fr-69: an Early Archaic Period Site in Northwestern Vermont (1980)
- Joseph C. McNeil Generating Station: Borrow Area Archaeological Evaluation (1981)
- Kingsland Bay Fish Hatchery,Ferrisburg, Addison County, Vermont: Archeological Reconnaissance Survey for Prehistoric and Historic Resources and Preliminary Site Evaluation of VT-Ad-324 (1984)
- Letter Report: Archeological Assessment for Brattleboro BRM 2000(9) (1983)
- Manchester-Dorset Rf019-2(14): Phase I Archaeological Survey Report (1979)
- Missisquoi National Wildlife Refuge: a Cultural Resource Survey (1979)
- Phase I Archaeological Assessment for St. Johnsbury RS-0113(14)-- "Benedict's Curve" (1979)
- Phase I Archaeological Assessment for the East Georgia Hydroelectric Project (1980)
- Phase I Archaeological Assessment for the Missisquoi Hydroelectric Project: Sheldon Springs, North Sheldon, Enosburg Falls, North Troy and Jay Branch Elements (1981)
- Phase I Archaeological Assessment for the Sheldon Springs Hydroelectric Project (1983)
- Phase I Archaeological Assessment for the Sheldon Springs Hydroelectric Project: Addendum (1984)
- Phase I Archaeological Assessment: Middlebury F219-3(20) (1980)
- Phase I Archaeological Study, Danville: Wastewater Treatment Facility (1981)
- Pownal RS Brs 0107(4) Bridge Relocation in Pownal, Vermont Phase I: Archaeological Reconnaissance (1979)
- Pownal-Bennington Highway Project: F019-1(4), (5), (16), F012-1, Phase I: Field Reconnaissance for Prehistoric and Historic Sites (1980)
- Preliminary Archaeological Assessment for the Fair Haven Hydroelectric Project, Fair Haven, Vermont (1986)
- Reconnaissance Survey and Site Evaluation for VT-Wd-36, Ball Mountain Lake, Jamaica, Vermont (1984)
- Relocation of Town Highway 4 Sheldon, Vermont Phase I: Archaeological Reconnaissance (1979)
- Report of the Archaeological Test Excavations of a Portion of Battery Park, Burlington, Vermont (1977)
- Results of Archeological Testing Relative To the Upper Castleton River Watershed Rechannelization Project (1983)
- Rouses Point Bridge Replacement Rouses Point, New York-Alburg, Vermont Reconnaissance Survey for Prehistoric and Historic Archaeological Resources (1982)
- Searsburg-Wilmington F010-1(18), Bennington and Windham Counties, Vermont: Archaeological Reconnaissance Survey and Historic Site Evaluations (1985)
- South Burlington M5200 (6) Phase I: Archaeological Assessment (1979)
- St. Johnsbury Fegc Dp Ef 041-1(10) Caledonia County, Vermont Archaeological Reconnaissance Survey (1985)
- Swanton Brs 0285(2): Phase I and II Archaeological Assessment (1979)
- Union Village Hydroelectric Project: Summary of Work Completed To Date
- Wells RS 0145(7): Phase I Archaeological Assessment (1980)
- Weybridge Street Housing Project, Middlebury, Addison County, Vermont: Archaeological Reconnaissance Survey for Prehistoric Resources and Site Evaluation of VT-Ad-342 (1985)
- Windham Court Apartments, Brattleboro,Vermont: Archeological Survey (1984)
- Wolcott Brf 030-2(4): Phase I Archaeological Assessment (1979)