US Army Corps of Engineers, NY District
No description specified.
1-9 (9 Records)
Documents
- Cultural Reconnaissance for the Peckman River, Little Falls Township and the Borough of West Paterson, Passaic County, New Jersey (1982)
- Cultural Resource Reconnaissance of the Western Portion of the North Avenue Closure Levee Elizabeth River Flood Control Project, Union Township, Union County, New Jersey (1986)
- Cultural Resource Survey of the Hopper Mill Site, Mahwah Township, Bergen County, New Jersey (1987)
- Cultural Resources Reconnaissance for the Mahwah and Ramapo Rivers and Masonicus Brook in the Village of Suffern, N.Y. and the Township of Mahwah, N.J (1981)
- Cultural Resources Reconnaissance for the New Jersey Shore from Highland Beach, Sea Bright To Deal Lake, Loch Arbour, Boroughs of Sea Bright and Monmouth Beach, City of Long Branch, Boroughs of Deal and Allenhurst, Village of Loch Arbour, (1985)
- Final Report for Atlantic Coast of New Jersey, Sea Bright To Ocean Township, Monmouth County: Remote Sensing of Proposed Offshore Sand Borrow Areas (1986)
- Passaic River Basin, New Jersey and New York, Phase I - General Design Memorandum: Interim Report On Flood Protection Feasibility, Ramapo and Mahwah Rivers, Mahwah, N.J. and Suffern, N.Y (1983)
- Phase I: Cultural Resources Reconnaissance, "Beach Erosion Control and Hurrican Protection Project at Staten Island" (1978)
- Recording of South Broad Street Bridge, City of Elizabeth, Union County, New Jersey (1982)