New Jersey Department of Transportation
No description specified.
1-22 (22 Records)
Documents
- Archaeological Monitoring of Construction in the Vicinity of the Abraham Jacobus Property and the Edison Jacobus Property, Towaco, Montville Township (1976)
- Archeological Investigations for the Rt. 49 Bridge over Salem River (Penns Neck Bridge) (St. No. 1707150) Project
- Camp Meeting Avenue Bridge, Montgomery Township, Somerset County, New Jersey, Archaeological Survey Report (1992)
- Case Report: Cities of Trenton and Bordentown, Townships of Hamilton and Bordentown, Route I-195-Arena Drive To I-295 Interchange, Route 295-US 130 To Kuser Road, Route NJ 29-Ferry Street To I-295 Interchange, Route NJ 19-US 1 To NJ 29 (1977)
- Combined Phase I and II Cultural Resources Survey, U.S. Route 130 Over (Abandoned) Kinkora Branch Railroad Bridges Project, Mansfield Township, Burlington County, New Jersey (2002)
- Environmental Study, Route 20 Connector from Route I-80 To Paterson Central Business District, County of Passaic, State of New Jersey: Volume One (1) of Six, Cultural Resource Study (1983)
- Erie Lackawanna Railroad Improvements Project (Hoboken Division), Morristown Line, Gladstone Branch, Montclair Branch, New Jersey: Environmental Assessment Report (1978)
- I-95 / 695 Environmental Studies from Route I-295 in Mercer County To Route I-287 In Somerset County: Technical Report No. 7, Historic Resources (1979)
- I-95 / 695 Environmental Studies from Route I-295 in Mercer County To Route I-287 In Somerset County: Technical Support Document No. 6, Archeology (1979)
- Interstate 295 Sections 1W and 1X, Hessian Avenue To Repaupo Road, Gloucester County, New Jersey: Final Environmental Impact State (1983)
- Interstate 295 Sections 1W and 1X, Hession Avenue To Rapaupo Road, Gloucester County, New Jersey: Draft Environmental Impact State (1982)
- Interstate Route 287 from U.S. Route 202, Montville, N.J., To the New York Thruway, Suffern, N.Y.: Final Environmental Impact State and Section 4(F) Evaluation (1982)
- Interstate Routes 195 and 295, New Jersey Routes 29 and 129, Mercer and Burlington Counties, New Jersey: Final Environmental Impact State, Volumes I and IV
- New Jersey Route 31 from the Routes 202 & 12 in Flemington To the Interstate 78, Clinton, Hunterdon County, New Jersey: Draft Environmental Impact State, Section 4(F) Evaluation (1983)
- New Jersy Route 24 Freeway, Brooklake Road To Interstate 287, Morris County, New Jersey: Draft Environmental Impact State and Section 4(F) Evaluation (1981)
- North Jersey Coast Line (Formerly the New York and Long Branch Railroad), South Amboy To Long Branch, Middlesex and Monmouth Counties, New Jersey: Environmental Assessment Report (1978)
- Preliminary Case Report for Faus Project M-7808(101), Two Bridges Road & Bridge (1980)
- Route 18 Freeway Section 3B & 3C from Deal Road To Wayside Road, Monmouth County, New Jersey: Draft Environmental Impact State (1984)
- Route 20 Connector from I-80 To Cbd Loop Road, City of Paterson, Passaic County, New Jersey: Draft Environmental Impact Statement / 4(F) Evaluation (1983)
- Supplemental Study for the Prefered Alternative, Route I-287 from U.S. Route 202, Montville, New Jersey To the New York State Thruway, Suffern, New York, Counties of Bergen, Morris, and Passaic, State of New Jersey, County of Rockland, STAT (1980)
- Two Bridges Road and Bridge Improvement, Borough of Lincoln Park, Morris County, & Township of Wayne, Passaic County, New Jersey: Environmental Assessment, Draft Section 4(F) Discussion (1980)
- U.S. Route 322 Section 4B, Mechanics Street To I-295, Gloucester County, New Jersey: Technical Support Doument, Volume II of II, Cultural Resource Survey (1977)