North Carolina Department of Transportation, Raleigh, N.C
No description specified.
101-127 (127 Records)
Documents
- Archaeological Survey, Bridge No. 53 Over Yadkin River, NC 18-268, Wilkes County, Tip No. B-1432 (1986)
- Archaeological Survey, Bridge Replacement Project for Bridge #215-94-80 and #215-94-90 On NC 215 Over Pigeon River Near Canton, Haywood County, I. D. Nos. B-717 and B-623 (1983)
- Archaeological Survey, Project B-603, Replacement of Bridge 58-32-10, NC 58 Over the Tar River, Nash County (1981)
- Archaeological Testing and Evaluation Report, US 264 Wilson Bypass, Corridor A, State Project No. R-524a (1983)
- Archaeological Testing Report, Bridge Replacement Project No. 8. 2046003 (B-56), Bridge No. 78 On Sr 1172, Jackson County (1983)
- Archaeological Testing, Bridge No. 198 On Sr 1172 Over Intercoastal Waterway at Sunset Beach, Brunswick County, Project No. B-682 (1985)
- Bridge No. 14 On Sr 2034 (New Hope Church Road) Over Marsh Creek, Wake County, B-2177 (1986)
- Bridge No. 40 On Sr 1664 Over Hare Snipe Creek, Wake County, B-2175 (1986)
- Cultural Resource Investigation of the Proposed East-West Thoroughfare Study Area, Forsyth and Guilford Counties, North Carolina (1981)
- Follow up Archaeological Study, Interstate 40, Raleigh To Benson, Project No. I-10 (Bb), Johnson County (1984)
- Follow up Archaeological Study, US 264 Bypass of Farmville, Pitt and Green Counties, Project No. R-525(Bb) (1988)
- Follow up Archaeological Study, US 264 Bypass of Farmville, Pitt and Greene Counties, R-525(H) (1988)
- Follow up Archaeological Study, US 264 To Greenville, Project R-526, Section C, Pitt County (1984)
- Follow up Archaeological Study, US 264, Wilson To Greenville, Project R-526 Section D, Pitt County (1983)
- Follow up Archaeological Survey, US 264 from Wilson To Greenville, Wilson County Section, State Project No. R-524 (C+D) (1983)
- Follow-Up Archaeological Work, US 264, Wilson County Line To Temporary US 264 Connector Near Farmville, Greene County, Project No. R-525a (1983)
- Intensive Archaeological Investigation of the Cultural Resources Potential of the Proposed US 74 Corridor (R-99B and R-99C), Polk and Rutherford Counties, North Carolina (1981)
- Intensive Archaeological Survey Proposed I-40 To U.S. 117 Connector, Sampson and Duplin Counties, Tip Project No. R-606 (1988)
- NC 209, Near Crabtree, Haywood County, R-521, Archaeological Study (1983)
- NC 87 Elizabethtown Bypass, Archaeological Study (1982)
- Preliminary Assessment of the Impact On Potential Archaeological Sites in the Valdese Area from the Planned Construction of Roadways, Burke County (1977)
- Report On the Archaeological Survey of Land To Be Affected By the Proposed Improvements To US 301 from Battleboro To Whitakers, Nash County (1981)
- Report On the Archaeological Survey of the Davis Drive Extension and Hobson Road Improvement Project in the Research Triangle Park, Durham County (1981)
- Report On the Cultural Resource Reconnaissance for Harris Boulevard, from I-77 at Sr 2113 To Sr 2467, Mecklenburg County, Project No. 8.2724501, U-609, Ch 79-1284 (1980)
- Supplemental Archaeological Survey of X-3 Corridor Section Ad, Sampson Co (1986)
- Supplemental Archaeological Survey Report, US 220, Ulah To Steeds, Randolph County, Tip Project No. R-523 (1988)
- Supplementary Archaeological Survey Report, Proposed Third Bridge To Bogue Banks, Alternate B-East, Carteret County, Project No. R-1006 (1985)