Cultural Resource Management Consults.
No description specified.
401-450 (511 Records)
Documents
- Cultural Resources Survey of the Proposed Rosa Unit No. 77a Pipeline (1995)
- Cultural Resources Survey of the Proposed Rosa Unit No. 8a Wellpad (1994)
- Cultural Resources Survey of the Proposed Rosa Unit No. 91a Well Pad (1996)
- Cultural Resources Survey of the Proposed Rosa Unit No. 9a Well Pad, Access Road, and Pipeline (1996)
- Cultural Resources Survey of the Proposed Ross "EG" Federal Com. No. 13 Well Pad and Access Road (1980' FSL, 660' FEL) (1994)
- Cultural Resources Survey of the Proposed Salt Water Disposal Line - No 4 Pure Gold C-17 Federal and No. 3 Pure Gold C-17 Federal-Central Tank Battery (Federal and State) (1994)
- Cultural Resources Survey of the Proposed San Juan 28-5 No. 229 Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 29-5 #65 Pipeline (1995)
- Cultural Resources Survey of the Proposed San Juan 29-6 No. 248 Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 29-6 No. 263 Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 30-4 No. 40 Pipeline (1996)
- Cultural Resources Survey of the Proposed San Juan 30-5 #22a Pipeline (1995)
- Cultural Resources Survey of the Proposed San Juan 30-5 No. 53E Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 30-6 #34 Interconnect Pipeline (1995)
- Cultural Resources Survey of the Proposed San Juan 30-6 #37 Interconnect Pipeline and Access Road (1995)
- Cultural Resources Survey of the Proposed San Juan 30-6 No. 30R Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 30-6 No. 48R Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 31-6 #12 Interconnect Pipeline (1995)
- Cultural Resources Survey of the Proposed San Juan 31-6 #234 Pipeline (1995)
- Cultural Resources Survey of the Proposed San Juan 31-6 No. 24E Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 31-6 No. 33E Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 31-6 No. 35E Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 31-6 No. 39E Conventional Pipeline (1993)
- Cultural Resources Survey of the Proposed San Juan 32-7 #39a Pipeline (1994)
- Cultural Resources Survey of the Proposed Santo Nino 19 Federal No. 1 Pipeline (1996)
- Cultural Resources Survey of the Proposed Shinnery "14" Federal Well #6 Well Pad and Access Road (1980' FNL; 1980' FEL), the Proposed Shinnery "14" Federal Well #7 Well Pad and Access Road (1980' FNL; 1980' FWL) (1994)
- Cultural Resources Survey of the Proposed Sims Com #1 Pipeline Reroute (1996)
- Cultural Resources Survey of the Proposed Sinagua "18" Fed. Com. Well Pad (2041' FSL; 2171' FEL) (1994)
- Cultural Resources Survey of the Proposed Socorro Keel B #53 Powerline (1994)
- Cultural Resources Survey of the Proposed Socorro Petroleum Corporation / Keel "B" #55 and "B" #56 Powerline (1994)
- Cultural Resources Survey of the Proposed Sterling Silver "3" Federal No. 2 Well Pad (660' FNL; 660' FWL) (1994)
- Cultural Resources Survey of the Proposed Sterling Silver "3" Federal No. 4 Well Pad and Access Road (660' FSL; 660' FWL) (1994)
- Cultural Resources Survey of the Proposed Sterling Silver "3" No. 6 and No. 1 Flowline (1994)
- Cultural Resources Survey of the Proposed Sterling Silver "34" Fed. #6 Well Pad and Access Road (330' FSL; 2310' FWL) (1994)
- Cultural Resources Survey of the Proposed Sterling Silver "34" Federal No. 5 Well Pad and Access Road (1980' FSL; 2310' FWL) (1994)
- Cultural Resources Survey of the Proposed Sunflower "AHW" Federal Well Nos. 4, 5, 6, 7, and Mimosa "AHS" Federal Well No. 6 Well Pads and Their Associated Access Roads / Pipeline (1994)
- Cultural Resources Survey of the Proposed Tank Battery (1994)
- Cultural Resources Survey of the Proposed Texaco Dow B Federal No. 28 Pipeline (T17S, R31E, Section 28) (1995)
- Cultural Resources Survey of the Proposed Todd 23P Fed. 15 Well Pad (1994)
- Cultural Resources Survey of the Proposed Todd 36L State 4 Powerline Corridor, Segment 2 (1995)
- Cultural Resources Survey of the Proposed Todd 36L State 4 Well Pad and Access Road (1994)
- Cultural Resources Survey of the Proposed Torre Alta Gathering System Trunk T and Loops Reroute (1996)
- Cultural Resources Survey of the Proposed Tract of Land (Building) (1994)
- Cultural Resources Survey of the Proposed Tracy 29 Federal No. 1 Well Pipeline Eddy County, New Mexico (1994)
- Cultural Resources Survey of the Proposed Tracy Federal "29" Well No. 1 Well Pad (950' FSL, 1980' FEL) (1994)
- Cultural Resources Survey of the Proposed Trunk a Booster Site Access Road (1996)
- Cultural Resources Survey of the Proposed Trunk a Booster Station (1995)
- Cultural Resources Survey of the Proposed Trunk B Booster and Suction / Discharge Line (1995)
- Cultural Resources Survey of the Proposed Trunk C Booster Station (1996)
- Cultural Resources Survey of the Proposed Trunk C Extension Loop Pipeline, Phase II (1993)