Cultural Resource Management Consults.
No description specified.
451-500 (511 Records)
Documents
- Cultural Resources Survey of the Proposed Trunk C Extension Loop, Hart Canyon Pipeline (1995)
- Cultural Resources Survey of the Proposed Trunk G Fuel Gas Crossover Pipeline (1996)
- Cultural Resources Survey of the Proposed Trunk R Extension Pipeline (1995)
- Cultural Resources Survey of the Proposed Trunk S Reroute Access Road (1996)
- Cultural Resources Survey of the Proposed Unocal "8" Federal Well No. 1 Well Pad and Access Road (1980' FNL, 660' FWL) (1994)
- Cultural Resources Survey of the Proposed Water Disposal Pipeline To Serve Saber Federal Well No. 1 (1994)
- Cultural Resources Survey of the Proposed West Kutz To Kutz Dakota Interconnect Pipeline, San Juan County, New Mexico (1995)
- Cultural Resources Survey of the Proposed West Red Lake Well No. 48 Well Pad and Access Road (1994)
- Cultural Resources Survey of the Proposed Western Geophysical Southeast Lea County Project, Phase 2 Lea County, New Mexico (1994)
- Cultural Resources Survey of the Proposed WFS Aztec CDP Boundary Expansion Project (1995)
- Cultural Resources Survey of the Proposed WFS Cedar Hill CDP Boundary Expansion Project (1995)
- Cultural Resources Survey of the Proposed WFS H-30 (G.C.N.M. Interconnect) Pipeline (1994)
- Cultural Resources Survey of the Proposed WFS Lateral B-5 Loop Pipeline (1996)
- Cultural Resources Survey of the Proposed WFS Lateral C-13 Extension Pipeline (1996)
- Cultural Resources Survey of the Proposed WFS Lateral C-19 Pipeline San Juan Gathering System (1995)
- Cultural Resources Survey of the Proposed WFS Lateral C-5 Loop Extension Pipeline (1996)
- Cultural Resources Survey of the Proposed WFS Lateral D-7 CDP (1996)
- Cultural Resources Survey of the Proposed WFS Maintenance Project: Miller Com #1 Dripline (1996)
- Cultural Resources Survey of the Proposed WFS Trunk L Compressor Fuel Line (1996)
- Cultural Resources Survey of the Proposed WFS-29-6#4 CDP Expansion Project (1994)
- Cultural Resources Survey of the Proposed Wild Turkey "9" State #1 Water Pipeline (1994)
- Cultural Resources Survey of the Proposed Williams Field Services - Texakoma Compressor Station (1995)
- Cultural Resources Survey of the Proposed Williams Field Services Navajo CDP Alternate Access Road (1995)
- Cultural Resources Survey of the Proposed Wiser Skelly Unit Tank Battery #2 Pipeline (1996)
- Cultural Resources Survey of the Proposed WO # 23684 - Powerline To Supply Socorro Petroleum Corporation - Keel "B" #47 (1994)
- Cultural Resources Survey of the Proposed WO #23665 - Keel "A" #20 and #21 Powerlines (1994)
- Cultural Resources Survey of the Proposed WO #23665 - Yates Petroleum Corporation - No. 13 Creek "AL" Powerline (1994)
- Cultural Resources Survey of the Proposed WO #23748 / Socorro Petroleum Corporation / West "A" #18 Powerline (1994)
- Cultural Resources Survey of the Proposed WO #23774 Powerline To Supply Marbob Energy Corporation, Inc. Burch-Keely Unit #243 (1994)
- Cultural Resources Survey of the Proposed WO #23775 / Socorro Petro. Corp. / Keel "B" #57 Powerline (1994)
- Cultural Resources Survey of the Proposed WO #23788 Powerline To Supply Marbob Energy Corporation, Inc. Burch-Keely Unit #244 (1994)
- Cultural Resources Survey of the Proposed WO #23843 Yates Petroleum Corporation Mojave "AJY" Com. #1 Powerline (1994)
- Cultural Resources Survey of the Proposed WO# 23771C - Marathon Oil Company / No. 1 MOC Federal Power Line (1994)
- Cultural Resources Survey of the Proposed WPX: Rosa #5a Cathodic Protection Line (1995)
- Cultural Resources Survey of the Proposed WPX: Rosa #8a Cathodic Protection Line (1995)
- Cultural Resources Survey of the Proposed Yates Petroleum Laguna Cedro "ADM" Federal Com. No. 1 Gas Pipeline (1995)
- Cultural Resources Survey of the Simms / Meridian Discharge Pipeline (1994)
- Cultural Resources Survey of the Trunk S To Trunk B Temporary Crossover Pipeline (1996)
- Cultural Resources Survey of the Williams Field Services's Proposed Hart Mountain Suction Bypass (1996)
- Cultural Resources Survey of Trunk a Cathodic Ground Bed (1994)
- Cultural Resources Survey of Two Proposed Water Guzzler Locations In Rio Arriba County, New Mexico (1993)
- Cultural Resources Survey of Yates Petroleum Corporation's Proposed Knoll "AOK" Well No. 1 and Access Road (1994)
- Cultural Resourcesd Survey of the Proposed Rosa Unit No. 24a Well Pad, Access Road, and Pipeline (1996)
- Cultural Survey of the Proposed Rosa No. 1E MD Wellpad and Access Road (1994)
- Culural Resources Survey of the Proposed Hallwood CDP #4 Delivery Line (1996)
- Cutural Resource Survey of the Proposed Lateral B-1 Extension Pipeline (1994)
- Data Recovery Plan For Sites La 72759, LA 78178, and LA 79469 On the Proposed Trunk S Pipeline Reroute, North Segment, In the Fruitland Coal Gas Gathering System, San Juan County, New Mexico (1996)
- E Cultural Resources Survey of the Proposed Phillips Petroleum San Juan 32-7 #36a Pipeline (1996)
- Heritage Resource Survey of Alamitos Mesa and Sawyer Mesa: Felling, Thinning, and Fuelwood, Santa Fe National Forest, Los Alamos County, New Mexico (1996)
- Interim Report On Archaeological Investigations At La 70642 a Probable Rosa Phase Domestic Scatter In Pilares Canyon, San Juan County, New Mexico (1994)