Cultural Resource Management Consults.
No description specified.
101-150 (511 Records)
Documents
- Cultural Resource Survey of the Proposed Mallon "27" Federal Well No. 2 Weel Pad and Access Road (1994)
- Cultural Resource Survey of the Proposed Mallon "27" Federal Well No. 3 Well Pad and Access Road / Pipeline (1994)
- Cultural Resource Survey of the Proposed Mallon "34" Federal Well No. 1 and Access Road (1994)
- Cultural Resource Survey of the Proposed Mallon "34" Federal Well No. 2 and Access Road (1994)
- Cultural Resource Survey of the Proposed Mallon "34" Federal Well No. 3 and Access Road (1994)
- Cultural Resource Survey of the Proposed Mallon "34" Federal Well No. 4 Well Pad and Access Road (1994)
- Cultural Resource Survey of the Proposed Mallon "34" Federal Well No. 5 Well Pad and Access Road (1994)
- Cultural Resource Survey of the Proposed Mallon "34" Federal Well No. 6 Well Pad and Access Road (1994)
- Cultural Resource Survey of the Proposed Mallon Federal "27" No. 2 Pipeline (1994)
- Cultural Resource Survey of the Proposed MOI Jicarilla 447 #2 Pipeline, Jicarilla Apache Indian Reservation, Rio Arriba County, New Mexico (1994)
- Cultural Resource Survey of the Proposed MOI Rosa Com No. 237 Pipeline (1994)
- Cultural Resource Survey of the Proposed MOI Rosa No. 263 Pipeline (1994)
- Cultural Resource Survey of the Proposed No. 3 Mallon Federal "27" - 3 Poly Surface Pipeline (1994)
- Cultural Resource Survey of the Proposed Rosa No. 144 Well Pad and Access Road (1994)
- Cultural Resource Survey of the Proposed Rosa Unit #139 Well Pad, San Juan County, New Mexico (1994)
- Cultural Resource Survey of the Proposed Rosa Unit #142 Well Pad Rio Arriba County, NM (1994)
- Cultural Resource Survey of the Proposed Rosa Unit #32a Pipeline, Rio Arriba County, New Mexico (1994)
- Cultural Resource Survey of the Proposed Rosa Unit #32a Well Pad and Access Road, Rio Arriba County, New Mexico (1994)
- Cultural Resource Survey of the Proposed Rosa Unit No. 143 Well Pad Rio Arriba County, NM (1994)
- Cultural Resource Survey of the Proposed Rosa Unit No. 44 Well Pad, Access Road, and Pipeline (1996)
- Cultural Resource Survey of the Proposed Rosa Unit No. 5a PM Wellpad and Access Road (1994)
- Cultural Resource Survey of the Proposed Rosa Unit No. 89a Well Pad, Access Road and Pipeline (1995)
- Cultural Resource Survey of the Proposed Trunk D Cathodic Ground Bed M.P. 37-75 (1994)
- Cultural Resource Survey of the Proposed Young North 7 Federal Number 1 Flow Line Lea County, New Mexico (1995)
- Cultural Resource Survey of Yates Petroleum Corporation's Proposed Aspen "AOH" Federal COMM Well No. 1 and Access Road (1994)
- Cultural Resource Survey of Yates Petroleum Corporation's Proposed Llama "All" Federal Well No. 1 and Access Road (1994)
- Cultural Resource Survey of Yates Petroleum Corporation's Proposed Salt Water Disposal Water Line, Section 29 and 30, T19S, R25E, Eddy County, New Mexico (1994)
- Cultural Resource Survey of Yates Petroleum Corporation's Proposed Sunflower "AHW" Federal No. 3 Well Pad and Access Road (1994)
- Cultural Resource Survey of Yates Petroleum Corporation's Proposed Tippin No. 1 Salt Water Disposal Line In Eddy County, NM (1994)
- Cultural Resources Inventory of the Proposed Gallegos Canyon Compressor Site (1994)
- Cultural Resources Inventory of the Proposed Rosa No. 145a Wellpad (1994)
- Cultural Resources Inventory of the River Bend "23" Federal Numbers 7 and 8 Pipe Line Gathering System Eddy County, New Mexico (1995)
- Cultural Resources of the Proposed Rosa 236 Pipeline (1994)
- Cultural Resources Report On Archaeological Monitoring and Survey of Two Drainage Crossings On the Rosa Road (1995)
- Cultural Resources Review of the Proposed WFS Maintenance Project: Culpepper No. 2 Pipeline (1996)
- Cultural Resources Survey Addendum To Report Dated June 21, 1994 the Proposed Half Federal Well No. 2 Well Pad and Access Road (1994)
- Cultural Resources Survey of 21 Temporary Use Areas Along the Lateral D-8 Pipeline Rio Arriba County, New Mexico (1993)
- Cultural Resources Survey of a Portion of the Proposed San Juan 32-8 No. 14-34 Pipeline (1993)
- Cultural Resources Survey of a Proposed 6" Pipeline To Texas Dow "B" 28 Fed. #1 (1995)
- Cultural Resources Survey of a Proposed 6" Poly Flowline Crossing Section 17, Township 17S, Range 30E, Eddy County, New Mexico (1995)
- Cultural Resources Survey of a Proposed Electric Power Line (1994)
- Cultural Resources Survey of a Proposed JFG Enterprise Oil and Gas Pipeline (1994)
- Cultural Resources Survey of a Proposed Pipeline Crossing of the Pecos River Section 16, Township 24 South, Range 29 East Eddy County, New Mexico (1995)
- Cultural Resources Survey of a Proposed SPS Power Line (1994)
- Cultural Resources Survey of an Archaeological Survey and Reassessment of the Proposed Allison Unit No. 110 Conventional Well-Tie Located In San Juan County, New Mexico (1993)
- Cultural Resources Survey of an Easement For the Krause WN Federal No. 7 Pipeline (1994)
- Cultural Resources Survey of Barbara Fasken's Proposed Baetz "23" Federal Well No. 2 Well Pad and Access Road (1994)
- Cultural Resources Survey of Emerald Gas Operating Company's Proposed Horton Federal CB-7 #1 Pipeline (1993)
- Cultural Resources Survey of Emerald Gas Operating Company's Proposed Storey Federal CB 34 #1 Conventional Pipeline (1993)
- Cultural Resources Survey of Emerald Operating Company's Proposed Horton Federal CB 13 #1, San Juan Conventional Pipeline (1993)