DOE / FERC
No description specified.
51-100 (106 Records)
Documents
- Missouri Madison Hydroelectric Project - Black Eagle and Rainbow Developments (1993)
- Missouri-Madison Hydroelectric Project - Hebgen Development, Erosion Effects Study (1993)
- Missouri-Madison Hydroelectric Project / Madison Development; Crm: Kobayashi Tracts Inventory (1994)
- Missouri-Madison Hydroelectric Project Great Falls Recreational Development: Cultural Resource Inventory and Development 1994 Field Season (1994)
- Missouri-Madison Hydroelectric Project, Report on Cultural Resource Assessment Studies on the Morony Development, 1992 Field Season (1992)
- Missouri-Madison Hydroelectric Project; CRM - Holter Development, Erosion Effects Assessment (1992)
- Native American Consultation for the Proposed Altamont Gas Pipeline Project (1995)
- Native American Consultation Per the Express Pipeline Project (1999)
- Northern Natrual Gas - Boyce 34-3 Pipeline (1992)
- Northern Natural Gas - Boyce 19-4 and Stirling 19-2 Pipeline (1992)
- Northern Natural Gas - Hillbrandt 3-6 Pipeline (1992)
- Northern Natural Gas - Tautges 29-8 Pipeline (1992)
- Northern Natural Gas - Tiger Ridge Mainline Metering Station (1992)
- Northern Natural Gas- Blaine County #3 Compressor Station (1992)
- Noxon Flage Poles (1998)
- Noxon Rapids Dam Office Construction Site (Confidential Avista) (1999)
- Overview of the Investigations Conducted Along the Montana Segment of the Express Pipeline Project (2000)
- Phase I Report Archaeology and Cultural Resources Intake Water Company (1978)
- Pipeline Right-Of-Way and Powerhouse Location (1985)
- (Preliminary Report on Test Investigations at Two Prehistoric Sites Near Glendive, MT, 24Dw140 and 24Dw142;, Montana-Dakota Utilities Cabin Creek Pipeline) (1980)
- (Professional Testimonial Concerning the Montana Power Company's Big Coulee-Reed Point Pipeline (1978)
- Proposed Aerial Powerline Route in Tiber Dam Area (1994)
- Proposed Columbus Development Corp. (1983)
- Proposed Cultural Resource Assessment Plan (1987)
- Proposed Cultural Resource Management Plan, Kerr Project (1987)
- Re-Examination of 18 Cultural Resources Adjacent to Flathead Lake, Lake and Flathead Counties, Montana (1989)
- Relocation of a Natural Gas Pipeline and the Construction of Two Staging Areas in Section 25, T8N, R47E and Sections 19 and 30, T8N, R48E, Custer County, Montana (1998)
- Research Design for Cultural Resource Mitigation Activities Kootenai Falls Cultural Resource District (1983)
- Results of Archaeological Testing at Site 24Sa290. (1990)
- Results of Further Testing and Summary of Mitigation Procedures Addendum To: Cultural Resource Inventory and Assessment 500 Kv Powerline Colstrip to Broadview (1981)
- The Results of the Cultural Resource Survey of the Proposed MDU Pipeline Route to Avoid 24Dw145 and 24Dw146 in Dawson County, Montana (1981)
- Results of the Testing Investigations at Two Sites (24Dw140 and 24Dw142) (1981)
- Results of the Testing Investigations at Two Sites (24Dw140 and 24Dw142), Dawson County, Montana (1981)
- Revised Inventory and Evaluation Report for Cultural Resources on the Proposed Altamont Gas Pipeline Project, Montana Segment (Original Version Dated 1 / 92 Is Also Attached) (1993)
- Revised Report: High Bridges and South Shore Development Thompson Falls Hydroelectric Development (1994)
- Rings at the Johnson Bison Kill Site, 24PH8 (1983)
- Ross Creek Hydroelectric Project (1986)
- Salvage Timber Sale on Avista Property (Confidential Avists) (1999)
- South Fork Deep Creek Hydroelectric Project (1984)
- Stone Ring Investigations Including the Lonesome Lake Traditional Cultural Property and Archaeological District Along the Express Pipeline in Montana (1999)
- A Summary of Available Information Concerning the Archaeological and Historical Resources in the Vicinity of Ryan Reservoir (1980)
- Supplemental Inventory and Evaluation Report for Cultural Resources on the Proposed Altamont Gas Pipeline Project: Montana Segment (1995)
- Synopsis of Eligibility Characteristics, the South Bank Site 24Dw140 (1980)
- Sythesis of Archaeological Investigations Conducted Along the Montana Segment of the Express Pipeline Project (1999)
- Test Excavations at Cultural Property 24LC1080 on the Holter Development of the Missouri-Madison Hydroelectric Project (2001)
- Testing and Evaluation of Prehistoric and Historic Archaeological Properties on the Hebgen, Madison, Holter and Ryan Developments, 1991 Field Season (1991)
- Testing of Prehistoric National Register of Historic Places Eligiblle Properties Located Within the Area of Potential Impact Along the Hebgen Reservoir in Gallatin County, Montana (2001)
- Thompson Falls Canada Goose Brood Rearing Project Area (1983)
- Thompson Falls Hydroelectric Project (1994)
- Thompson Falls Hydroelectric Project, FERC Project No. 1869, Amendments to Plant Redevelopment Plan, Cultural Resource Management, Review and Management Plan (1992)