Chris Elmore
No description specified.
1-16 (16 Records)
Documents
- A Phase I Archaeological Survey of a .30 Acre Borrow Site Near Yaden, Whitley County, Kentucky (2001)
- A Phase I Archaeological Survey of a 0.72 Hectare (1.8 Acre) Borrow Site, Madison County, Kentucky (2000)
- A Phase I Archaeological Survey of a 6 Kilometer Long (3.7 Mile) Corridor Along Clays Mill Road, in Fayette County, Kentucky (2002)
- A Phase I Archaeological Survey of a Microwave Tower Site Near Burnside, Pulaski County, Kentucky (2001)
- A Phase I Archaeological Survey of a One-Half Acre Proposed Borrow Site Near Clover Creek, Breckinridge County, Kentucky (2001)
- A Phase I Archaeological Survey of a Proposed Microwave Tower Site Near Lawrence Creek Church, Mason County, Kentucky (2001)
- A Phase I Archaeological Survey of a Ten Acre Borrow Site Located Near Ricedale, Kenton County, Kentucky (2001)
- A Phase I Archaeological Survey of the Charters Substation in Lewis County, Kentucky (2000)
- A Phase I Archaeological Survey of the North Floyd Substation Located Near Waynesburg, Lincoln County, Kentucky (2001)
- A Phase I Archaeological Survey of the One Acre Fox Hollow Power Sub-Station in Barren County, Kentucky (2001)
- A Phase I Archaeological Survey of the One Acre Kidwell Communication Tower Construction Site, Rockcastle County, Kentucky (2001)
- A Phase I Archaeological Survey of the One Acre Mize Communication Tower Construction Site Pulaski County, Kentucky (2001)
- A Phase I Archaeological Survey of the One Acre Shelly Communication Tower Construction Site in Lincoln County, Kentucky (2001)
- A Phase I Archaeological Survey of the Proposed Union City Sub-Station, Madison County, Kentucky (2001)
- A Phase I Archaeological Survey of the Sandgap Sub-Station, Jackson County, Kentucky (2001)
- A Phase I Archaeological Survey of the Two Acre McKee District Operations Center, Jackson County, Kentucky (2000)