On 29 January 1991, Northland Research, Inc. (Northland) completed a Class III archaeological survey of proposed pole locations for a rebuilding project of the Salt River Project's Wheeler-Evergreen 69 kV transmission line. As portions of the surveyed area are located on the Salt River Pima-Maricopa Indian Reservation, a special use permit was obtained for archaeological survey and testing (permit No. 396 269-91). The survey was accomplished in two person-days. No archaeological sites were...
SRP 69 kV Subtransmission Line Reconductoring Project, Draft Environmental Assessment (2002)
This Environmental Assessment (EA) has been prepared to evaluate Salt River Project (SRP) proposed plans to perform major maintenance to two 69 kilovolt (kV) subtransmission lines within an SRP power line utility corridor easement. Although this project is not a Federal undertaking or action, this EA has been prepared in accordance with the guidelines contained in the Bureau of Indian Affairs (BIA) Manual Release No. 9303, NEPA Handbook, September 24, 1993. The manual provides guidance for...