Archaeological Investigations at the Westwing Site, AZ T:7:27 (ASU), Agua Fria River Valley, Arizona (1974)
DOCUMENT Full-Text Donald E. Weaver, Jr..

This report describes the archaeological excavations at, and subsequent laboratory analysis of material from, the Westwing Site, AZ T:7:27 (ASU), lying within the Salt River Project and the United States Bureau of Reclamation rights-of-way between the Westwing Substation and the Eastwing Substation, Maricopa County, Arizona. The excavations concentrated on the area to be impacted by construction of Tower Number 4 of the transmission line and the associated access road and support...


Final Report of Findings: Phase 1 Data Recovery at AZ T:7:366(ASM) for the Northern Parkway Project, Near El Mirage, Maricopa County, Arizona (2013)
DOCUMENT Full-Text Glennda Gene Luhnow.

Maricopa County Department of Transportation (MCDOT) plans to improve Northern Avenue to be a parkway in the Phoenix metropolitan area where no freeways are planned. At the request of Mr. Robin Shishido of Parsons, a cultural resource assessment of the project area of potential effects (APE) was conducted by Archaeological Consulting Services, Ltd. (ACS). The purpose of the cultural resource assessment was to identify any historic properties in the APE that could be affected by the undertaking...


Preliminary Report of Findings: Phase 1 Data Recovery at AZ T:7:366(ASM) for the Northern Parkway Project, Near El Mirage, Maricopa County, Arizona (2013)
DOCUMENT Full-Text Glennda Gene Luhnow.

MCDOT plans to improve Northern Avenue to be a parkway in the Phoenix metropolitan area where no freeways are planned. At the request of Mr. Robin Shishido of Parsons, a cultural resource assessment of the project area of potential effects (APE) was conducted by Archaeological Consulting Services, Ltd. (ACS). The purpose of the cultural resource assessment was to identify any historic properties in the APE that could be affected by the undertaking (Schilling and Jones 2012). Two historic...


Results of Construction Monitoring at AZ T:7:174(ASM) for the Northern Parkway Project Near El Mirage, Maricopa County, Arizona (2015)
DOCUMENT Full-Text Linda M. Schilling.

MCDOT plans to improve Northern Avenue to be a parkway with gradeseparated intersections at major cross streets to provide a higher-speed, higher-capacity, east-west route in the northwestern portion of the Phoenix metropolitan area where no freeways are planned. At the request of Mr. Robin Shishido of Parsons, Archaeological Consulting Services, Ltd. (ACS) conducted construction monitoring pursuant to recommendations presented in a plan of work for cultural resources previously identified...