USA (Country) (Geographic Keyword)

30,751-30,775 (35,822 Records)

Response from Stan Graves to Richard Strimel, Priority List of Buildings to Receive New Roofs, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission received a list from the Environmental Management Office of buildings on the Fort Sam Houston Post which are proposed to receive new roofs in the 1991 fiscal year. This letter is the Commission's feedback on each building and whether or not the project would have "no effect" for each historical structure.


Response from Stan Graves to Richard Strimel, Proposed Fence and Gate Plan, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Detailed correspondence of the Texas Historical Commission's feedback on Fort Sam Houston's submittal of drawings illustrating the proposed design of fences and gates at Fort Sam Houston Texas.


Response from Stan Graves to Richard Strimel, Proposed Utility Building Behind Building 369, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission reviewed the proposed project of a new utility building being constructed behind Building 369. They determined "no adverse effect" and this letter details their conditions.


Response from Stan Graves to Richard Strimel, PX Expansion Design, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

This letter gives a lengthy set of recommendations and concerns by the Texas Historical Commission in regards to the design drawings received from Fort Sam Houston for the PX expansion project. Carbon copied to this correspondence is Mike Hilger (Base Historical Architect) and Larry Taylor (AAFES).


Response from Stan Graves to Richard Strimel, Removal of Rail Line Trestle Bridge and New Construction of Branch Exchange Shopette (1991)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission sent this letter to Fort Sam Houston to inform them that the rail line trestle bridge that was being considered for removal was recently determined eligible for the National Register of Historic Places. As a result, the propose demolition of the structure will clearly have an "adverse effect" on the structure and its environment. Carbon copied to the letter is Michael Hilger, Army Corp of Engineers and Claudia Nissley, ACHP.


Response from Stan Graves to Richard Strimel, Renovation of Second Floor of Quadrangle, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

Design plans and specifications for the renovation of the second floor at the Quadrangle, Building 16, have been received by the Texas Historical Commission. This letter details the Commission's suggestions and comments after review. Carbon copied to this correspondence is Amy Dase, National Register Historian.


Response from Stan Graves to Richard Strimel, Restoration of the Quadrangle, Fort Sam Houston, Texas (1993)
DOCUMENT Full-Text Stanley O. Graves.

Letter confirming that the Texas Historical Commission has received revised specifications for the restoration of the Quadrangle at Fort Sam Houston. Carbon copied is Mike Hilger.


Response from Stan Graves to Richard Strimel, Sallyport Restoration at the Quadrangle, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

The design plans and specifications for the restoration of the sallyport at the Quadrangle, Building 16, were sent by Fort Sam Houston to the Texas Historical Commission. This letter details the Commission's suggestions and comments on the documents submitted.


Response from Stan Graves to Richard Strimel, Screen Door Installation at Quadrangle, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

Requests by the Texas Historical Commission concerning the design of screen door installations at the Quadrangle, Fort Sam Houston. If these design requests are agreed upon then the project will have "no effect" on the Landmark.


Response from Stan Graves to Richard Strimel, Security Gate and Fencing Design Plans, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

Fort Sam Houston forwarded to the Texas Historical Commission plans for security fencing along Grayson Street. The Commission supports the design but notes discrepancies in the drawings. Carbon copied to this letter is Michael Hilger.


Response from Stan Graves to Richard Strimel, Security Gate and Fencing Design, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Fort Sam Houston submitted to the Texas Historical Commission plans for security fencing on the perimeter of Fort Sam Houston. This letter is a response to the project submittal and comments on some issues that have not been addressed in the project design.


Response from Stan Graves to Richard Strimel, Security Gate and Fencing Design, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission has received revised plans for the security gate on the perimeter of Fort Sam Houston. If the recommendations in this letter are incorporated into the finalized set of plans, then the Commission will concur with the findings of "no adverse effect."


Response from Stan Graves to Richard Strimel, Staff Post 12 Closet Installation, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission writes that they have received Fort Sam Houston's letter documenting a recent site visit and can now determine "no effect" on Staff Post #12 for the installation of interior bedroom closets.


Response from Stan Graves to Richard Strimel, Structural Repairs to Quarters 115, 35 Percent Review, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Fort Sam Houston submitted plans and related conditional information for the 35% design review of structural repairs to Quarters 115. This letter gives the Commission's recommendations.


Response from Stan Graves to Richard Strimel, Structural Repairs to Quarters 115, 90 Percent Review, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

This letter is the Texas Historical Commission's response to Fort Sam Houston's submittal of their 90% design review submittal for structural repairs to Quarters 115. Carbon copied to this correspondence is Paul McGruff, Army Corps of Engineers, and Claudia Nissley, Advisory Council on Historic Preservation.


Response from Stan Graves to Richard Strimel, Structural Repairs to the Gift Chapel 90 Percent Review, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission has received and reviewed Fort Sam Houston's submitted plans for the 90% design review of structural repairs to the Gift Chapel and construction of a new mechanical building. This letter details the Commission's comments and suggestions pertaining to the submitted plans.


Response from Stan Graves to Richard Strimel, Structural Repairs to the Gift Chapel, 35 Percent Review, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Correspondence between the Texas Historical Commission and Fort Sam Houston on the submittal of plans and the 35% design review os structural repairs to the Gift Chapel and construction of a new mechanical building. The letter goes on to detail concerns and suggestions by the Commission for the project.


Response from Stan Graves to W.H. Hill, Closing of Field Offices in Building 4011, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

This letter by the Texas Historical Commission respectfully declines to comment on the closing of the Defense Mapping Agency Functions in Building 4011, which does not need coordinating with the Commission. Carbon copied to the letter is Richard Strimel, Environmental Management, Fort Sam Houston.


Response from Stan Graves to W.H. Hill, Existing Conditions Survey for Fort Sam Houston and Camp Bullis, Volumes I-IV, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission received a copy of the document "Existing Conditions Survey for Fort Sam Houston and Camp Bullis, Vols..I-IV" from Fort Sam Houston for review. This letter contains the Commission's draft submittal with detailed comments for consideration.


Response from Stan Graves to W.H. Hill, Follow-Up Review, Existing Conditions Survey for Fort Sam Houston and Camp Bullis, Vols. I-IV, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

After a second review of the "Existing Conditions Survey for Fort Sam Houston and Camp Bullis, Vols. I-IV," the Texas Historical Commission drafted this letter with a few general and specific questions and comments to Fort Sam Houston. Carbon copied to this correspondence is Richard Strimel, Chief, Environmental Management Office.


Response from Stanley Graves and James Bruseth to Kim Rightmire, Environmental Assessment for Fort Sam Houston Housing, Fort Sam Houston, Texas (1997)
DOCUMENT Full-Text Sharon E. Fleming. Stanley O. Graves. Mark Denton. James E. Bruseth.

The Texas Historical Commission has received and reviewed a scope from TRC Mariah Associates for Fort Sam Houston's Housing Environmental Assessment. This letter details the Division of Antiquities Protections review of the assessment along with the review by the Division of Architecture. Copied to this correspondence is John Brennemen (ENV, Fort Sam Houston).


Response from Stanley Graves and James Steely to John Brenneman, Pocket Guide to the New Post, Fort Sam Houston, Texas (1995)
DOCUMENT Full-Text Stanley O. Graves. James W. Steely.

This letter confirms that the Texas Historical Commission has received from Fort Sam Houston a copy of "A Little More Distinctive: A New Post, Fort Sam Houston" and "Pocket Guide to the New Post, Fort Sam Houston." Copied to this correspondence is John Manguso (Director, Fort Sam Houston Museum) and Mike Hilger (Historical Architect, Fort Sam Houston).


Response from Stanley Graves to David Brigham, Garage at Schmidt Ranch, Camp Bullis, Texas (1997)
DOCUMENT Full-Text Stanley O. Graves. Sharon E. Fleming.

This letter is the Texas Historical Commission's confirmation that it is in the best interest of the Schmidt Ranch Garage that it should be abandoned rather than demolished.


Response from Stanley Graves to David Walker, New Barracks Facility 100 Percent Design Documents, Fort Sam Houston, Texas (1997)
DOCUMENT Full-Text Stanley O. Graves. Sharon E. Fleming.

The Texas Historical Commission has received and reviewed the 100% design documents and finish material samples from Fort Sam Houston for the new barracks facility. This letter details the Commission's comments and recommendations from their review.Copied to this correspondence is David Brigham (Cultural Resources Manager, Fort Sam Houston) and Mike Hilger (Historical Architect, Fort Sam Houston).


Response from Stanley Graves to David Walker, Rehabilitation of Building 2376, Fort Sam Houston, Texas (1998)
DOCUMENT Full-Text Sharon E. Fleming. Stanley O. Graves.

The Texas Historical Commission has received and reviewed a recent letter from Fort Sam Houston regarding alterations to Building 2376. In order to determine the type of effect, the Commission requests documents that thoroughly describe the work currently proposed. Copied to this correspondence is David Brigham (Cultural Resource Manager, Fort Sam Houston) and Mike Hilger (Historical Architect, Fort Sam Houston).