Pecos Road (Geographic Keyword)
1-3 (3 Records)
The Arizona Department of Transportation (ADOT) initiated preparation of a new Environmental Impact Statement and Location/Design Concept Report in 2001 to consider alternatives to the findings of the 1988 South Mountain Freeway concept (SMCT 2001). In the summer of 2001, HDR Engineering, Inc. was contracted to provide services in connection with this project. The GRIC-CRMP was subcontracted to provide a Class I cultural resource overview of the study area (Burden 2002) and subsequently to...
A Cultural Resources Assessment of Potential Routes for the Salt River Project's Proposed 230 kV Electric Transmission Line in District 4 of the Gila River Indian Community, Maricopa and Pinal Counties, Arizona (2013)
This report presents the results of a Cultural Resources Assessment (Class I Records Search, with limited supplemental fieldwork) by the Gila River Indian Community (GRIC) Cultural Resource Management Program (CRMP) for the proposed construction of a 230 kV electric transmission line in District 4 of the GRIC, Maricopa and Pinal Counties, Arizona (CRMP Project No. 2012.36x0). Implementation of the proposed undertaking will require approval from the Bureau of Indian Affairs (BIA), Pima Agency....
Technical Memorandum: A Consideration of the Tempe and Western Canals (1993)
This report was prepared at the request of the Arizona Department of Transportation (ADOT) for documentation concerning the present condition of the Tempe and Western canal segments subject to impact by the proposed Price Freeway between the Superstition Freeway and Pecos Road. Both structures are part of an extensive canal system, identified today as the Salt River Project System, that conveys water for agricultural, industrial, and municipal uses throughout the Salt River Valley. The canal...