SR 87 (Geographic Keyword)
1-2 (2 Records)
The Arizona Department of Transportation (ADOT) plans to extend the Red Mountain Freeway through Mesa, Arizona from State Route (SR) 87 to US Route (US) 60. This project will result in the construction of a new limited access six-lane freeway. Construction in the right-of-way is currently confined to the area between SR 87 and Gilbert Road. The proposed route runs through an area of dense historic and prehistoric cultural resources south of McDowell Road, including the northern edge of the Lehi...
SRP 69 kV Subtransmission Line Reconductoring Project, Draft Environmental Assessment (2002)
This Environmental Assessment (EA) has been prepared to evaluate Salt River Project (SRP) proposed plans to perform major maintenance to two 69 kilovolt (kV) subtransmission lines within an SRP power line utility corridor easement. Although this project is not a Federal undertaking or action, this EA has been prepared in accordance with the guidelines contained in the Bureau of Indian Affairs (BIA) Manual Release No. 9303, NEPA Handbook, September 24, 1993. The manual provides guidance for...