A Cultural Resources Assessment of Potential Routes for the Salt River Project's Proposed 230 kV Electric Transmission Line in District 4 of the Gila River Indian Community, Maricopa and Pinal Counties, Arizona (2013)
DOCUMENT Full-Text Christopher P. Garraty.

This report presents the results of a Cultural Resources Assessment (Class I Records Search, with limited supplemental fieldwork) by the Gila River Indian Community (GRIC) Cultural Resource Management Program (CRMP) for the proposed construction of a 230 kV electric transmission line in District 4 of the GRIC, Maricopa and Pinal Counties, Arizona (CRMP Project No. 2012.36x0). Implementation of the proposed undertaking will require approval from the Bureau of Indian Affairs (BIA), Pima Agency....


A Cultural Resources Survey of 33 Acres for the Proposed Salt River Project Receiving Station-24 Near Meridian and Rittenhouse Roads, Queen Creek, Maricopa County, Arizona (2009)
DOCUMENT Full-Text Beth Hyman.

SRP is planning to construct a receiving station— RS-24— as part of the proposed Abel-Moody 230 kV transmission line project, currently in the siting process. As part of SRP’s land acquisition guidelines, SRP requested that Logan Simpson Design (LSD) conduct a Class III cultural resources survey of the proposed RS-24 site to determine whether any significant cultural resources will be disturbed by the construction. July 2009, Submittal 2


Faunal Analysis for Phase II Data Recovery at Pozos de Sonoqui/AZ U:14:49 (ASM) Within the Proposed Alignment of Riggs Road (2018)
DOCUMENT Full-Text Andrea Gregory.

A total of 3,757 faunal fragments was recovered from Phase II data recovery investigations at Pozos de Sonoqui, AZ U:14:49(ASM). The project area is situated within saltbush communities bordered by creosote-bursage with pockets of denser, shrubbier vegetation associated with drainages and areas along nearby Queen Creek, Sonoqui Wash, and the Gila River; irrigation canals were present prehistorically and upland resources are also located in proximity to the site (Chenault and Stubing 2012). The...


Results of Phase I Data Recovery at Pozos de Sonoqui, AZ 11:14:49 (ASM), Along the Planned Riggs Road Alignment, Queen Creek, Maricopa County, Arizona (2007)
DOCUMENT Full-Text Robert B. Neily. Jackie L. Orcholl.

Between August 13 and 24, 2007, Phase I data recovery excavations were conducted within a 1,550-m-long by 43-m-wide segment of the planned Riggs Road corridor that extends through the northern portion of AZ U:14:49 (ASM)—also known as Pozos de Sonoqui—a National Register of Historic Places (NRHP)- eligible prehistoric site in southeastern Maricopa County. The project uses Federal Highway Administration (FHWA) funding to be administered by the Arizona Department of Transportation (ADOT) Local...