Incised stone (Material Keyword)
1-2 (2 Records)
Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project
Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project: Incised Stone Analysis Table (2017)
PROJECT
Uploaded by: Sarah Creer
In May 2015, PacifiCorp (doing business as Rocky Mountain Power, Proponent) requested that SWCA Environmental Consultants conduct archaeological laboratory analyses and report preparation from data recovery testing and excavations conducted for the Sigurd to Red Butte No. 2 – 345kV Transmission Project (Project).The 277.32-kilometer (172.32-mile) Sigurd to Red Butte No. 2 – 345-kilovolt (kV) transmission line runs from the existing Sigurd Substation in Sevier County, Utah, to the existing Red...
Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project: Incised Stone Analysis Table (2017)
DATASET
Incised stone analysis data from the Sigurd to Red Butte No. 2 – 345kV Transmission Project.