Salt River Project: Superior to Silver King 115kV Transmission Line Reroute, Pinal County, Arizona (2012)
DOCUMENT Full-Text WIlliam L. Deaver.

Salt River Project (SRP) plans to reroute a segment of the Superior-Silver King 115 kV transmission line that crosses lands owned by Resolution Copper Mining (Resolution) west of Superior, Pinal County, Arizona. The transmission line draws power from the existing SRP Silver King to Kyrene East End Transmission System (SKKEETS). The transmission line is located entirely on lands owned by Resolution, and the project is the relocation of an existing 115 kV line segment. The relocation of the power...