Schist Pestles (Material Keyword)
1-1 (1 Record)
Archaeological Evaluation of Three Sites for the Goldfield-Silver King 230 kV Transmission Line, Near Superior, Arizona (2000)
DOCUMENT
Full-Text
Salt River Project (SRP) is planning to install fiber optic communication on the Goldfield to Silver King 230 kV transmission line system on the Mesa and Globe Ranger districts in Pinal County, Arizona. The project will entail replacing a static line with a combination static-fiber optic line. This will require a wire trailer/puller and crane to be positioned near certain towers for wire pulling. Both pieces of equipment are rubber-tired to minimize ground disturbance. SWCA was contracted to...