plexiglass material (Material Keyword)
1-1 (1 Record)
VAFB-2019-21: DRAFT Point Conception Light Station Conditions Assessment and Repairs Study, Contract No. GS10F0059N, Task Order FA8903-15-F-0023 (PWS Task 4.12.3) (2019)
DOCUMENT
Full-Text
This document is a study intended to serve as a preliminary analysis of the current conditions and possible repairs for the Point Conception Lighthouse and Family Quarters C. The field investigations consisted of visual surface observations, avoided destructive analysis, and did not include the preparation of structural calculations, structural or material testing, or development of design or construction drawings. This report and cost estimates are intended to provide the USAF with a rough...