pedestrian bridge (Other Keyword)
1-3 (3 Records)
Joint Base Elmendorf-Richardson (JBER) had proposed to conduct watershed and fishery enhancement activities in the Otter Creek and Six mile Creek watersheds within the boundaries of the installation. The U.S. Army Corps of Engineers (USACE), on behalf of the 673d Civil Engineer Squadron, Environmental Conservation Section, contracted AECOM Technical Services (AECOM) to perform cultural resources surveys of the project's APE at Otter Creek and six mile Creek. This document details those surveys.
Joint Base Elmendorf-Richardson Resources
Project metadata for resources within the Joint Base Elmendorf-Richardson cultural heritage resources collection. This project is used to fill metadata for all resources part of the Joint Base Elmendorf-Richardson collection.
Phase I Archival and Archeological Investigations of the Proposed Linganore Creek Wastewater Interceptor, Frederick County, Maryland (1994)
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.