Building 4192 (Other Keyword)
1-8 (8 Records)
Architectural and structural condition studies prepared for various historic properties at Fort Sam Houston. Copies of these reports have also been forwarded to the Fort Worth District. The submittal of these documents is in partial fulfillment of the contractual obligations of Geo-Marine, Inc., under contract number GS-10F-0207J.
Architectural Assessment, Building 4192, Fort Sam Houston Military Reservation, Texas (2005)
An architectural assessment concerning observations made in June of 2005 at Building 4192, Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, were asked to evaluate the structural and architectural conditions of the building, its integrity, and its potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor load requirements, accessibility, and the property’s historic status. Building 4192, built...
Correspondence Packet, 2005 Geo-Marine Evaluations of Buildings 135, 4191, 4192, and 4193, Fort Sam Houston, Texas
Geo-Marine, Inc. (GMI), and its consultants, Mr. Joe Freeman (Historic Architect) and Jaster-Quintanilla (Structural Engineers), were asked to evaluate the structural and architectural conditions of Buildings 135, 4191, 4192, and 4193 at Fort Sam Houston, as well as their integrity and potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor load requirements, accessibility, and the property’s historic status. Costs...
Correspondence Packet, Geo-Marine Evaluations of Buildings 135, 4191, 4192, and 4193, Fort Sam Houston, Texas (2005)
Geo-Marine, Inc. (GMI), and its consultants, Mr. Joe Freeman (Historic Architect) and Jaster-Quintanilla (Structural Engineers), were asked to evaluate the structural and architectural conditions of Buildings 135, 4191, 4192, and 4193 at Fort Sam Houston, as well as their integrity and potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor load requirements, accessibility, and the property’s historic status. Costs...
Letter from Victoria Clow to Michael Pumphrey, Building 4192, Fort Sam Houston, Texas (2005)
This letter and the two attached reports concern observations made by Geo-Marine, Inc., and its Historic Architect and Structural Engineers, of Building 4192 at Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, Mr. Joe Freeman (Historic Architect) and Jaster-Quintanilla (Structural Engineers), were asked to evaluate the structural and architectural conditions of Buildings 135, 4191, 4192, and 4193 at Fort Sam Houston, as well as their integrity and potential for reuse in an...
Letter from Victoria Clow to Michael Pumphrey, Building 4192, Fort Sam Houston, Texas (2005)
This letter and its two attached reports concern observations made in June of 2005 at Building 4192, Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, were asked to evaluate the structural and architectural conditions of the building, its integrity, and its potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor load requirements, accessibility, and the property’s historic status. Building...
Response from James Steely and Stanley Graves to John Brenneman, Roof Replacement at Building 4192, Fort Sam Houston, Texas (1993)
Fort Sam Houston provided the Texas Historical Commission with proposed design options for a roof replacement at Building 4192. This letter by the Commission stresses the importance of the roof replacement and that it may have a "profound" effect on the appearance of the historical building. The letter goes on to detail a review by the National Register Department.
Structural Assessment, Building 4192, Fort Sam Houston Military Reservation, Texas (2005)
A structural assessment concerning observations made in June of 2005 at Building 4192, Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, were asked to evaluate the structural and architectural conditions of the building, its integrity, and its potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor load requirements, accessibility, and the property’s historic status. Building 4192, built in...