230 kV Transmission Line (Other Keyword)

1-9 (9 Records)

Archaeological Investigations, Salt River Project, Silverking to Kyrene Transmission Line, Tonto National Forest, Pinal County, Arizona: Final Report for an Archaeological Survey of Tower Anchoring Locations, Pulling Locations, Access Roads, and a Wire Set-up Location for the 500 kV and 230 kV Silverking to Kyrene Transmission Lines, Tonto National Forest, Pinal County, Arizona, A-78-119 (1979)
DOCUMENT Full-Text Steven G. Dosh.

At the request of Salt River Project, the Museum of Northern Arizona conducted an archaeological survey of Tonto National Forest lands to be impacted by the construction of the Silverking to Kyrene 500 kV and 230 kV transmission lines near Superior, Arizona. The impact areas surveyed consist of tower anchoring locations, pulling locations, access roads, and a wire set-up location. What appeared to be prehistoric check dams were observed at the pulling location and designated site NA15,784. No...


Archaeological Investigations, Salt River Project, Silverking-Hayden Transmission Line, 230 kV Corridor Segment from Silverking Substation South to Tonto National Forest Boundary, Federal (Tonto National Forest) and State Lands, Pinal County, Arizona: Final Report for Archaeological Survey of 9.3 mi of Transmission Line Corridor, Silverking Substation Area, Tonto National Forest (1978)
DOCUMENT Full-Text Donald Keller.

Approximately 9 mi of transmission line corridor extending southward from the Silverking Substation towards Hayden were surveyed for archaeological resources by the Museum of Northern Arizona in June, 1978. Three prehistoric and historic Anglo-American affiliation archaeological sites were identified along the corridor between the Silverking Substation and the Tonto National Forest boundary. The report describes the survey and its results and makes archaeological recommendations for the survey...


Archaeological Monitoring for 13 Sites for the SRP Silver King to Goldfield 230 kV Upgrade Project, North of Superior, Pinal County, Arizona (2009)
DOCUMENT Full-Text Michael S. Foster.

Logan Simpson Design Inc. (LSD) has previously completed a cultural resources inventory of 18.3 miles of the existing Salt River Project (SRP) 230 kV Silver King to Goldfield electrical transmission line north of Superior, Arizona. SRP is upgrading the carrying capacity of the line (Figure 1). The cultural resources inventory resulted in the identification of 26 archaeological sites including 5 newly recorded and 21 previously recorded (Bild 2008). Ten of these sites are considered eligible for...


Archaeological Monitoring of Pole Replacement at Salt River Project Structures CP-25 and CP-28 for the Goldfield-Silver King 230kV Project within AZ U:10:49 (ASM)/AZ U:10:2 (BLM), Apache Junction, Maricopa County, Arizona (2009)
DOCUMENT Full-Text Robert A. Rowe. Michael Foster.

This technical memo presents the results of archaeological monitoring by Logan Simpson Design during the installation of Salt River Project (SRP) poles at stations CP-25 and CP-28 along the Goldfield-Silver King 230 kV transmission line within the boundary of AZ U:10:49 (ASM)/AZ U:10:2 (BLM). Because the construction site is located on land administered by the Bureau of Land Management (BLM), the project is considered an undertaking as defined under 36 CFR § 800 (as revised in 2004), the...


A Cultural Resources Survey of 22.1 Acres of State and Private Lands West of the Tonto National Forest Boundary for the SRP Silver King to Goldfield 230kV Upgrade, Queen Valley, Pinal County, Arizona (2008)
DOCUMENT Full-Text David A. Bild.

The Salt River Project (SRP) is planning to upgrade the current carrying capacity of 18.3 miles of the existing Silver King to Goldfield 230kV line north of Queen Valley and Superior, Pinal County, Arizona. In order to accomplish this, SRP plans to “bundle” the existing 230kV conductors by adding a second conductor to each of the three existing single-conductor phases. This 230kV line was originally intended for two circuits of bundled conductors and permitted for such on Forest Service lands by...


A Cultural Resources Survey of Approximately 13 Acres for Wire Pulling Locations for a New SRP 230-kV Transmission Line from Kortsen Road to Thornton Road, Casa Grande, Pinal County, Arizona (2013)
DOCUMENT Full-Text Justin P. Rego.

Salt River Project Agricultural Improvement and Power District (SRP) requested that Logan Simpson Design Inc. (LSD) perform a Class III cultural resources survey prior to anticipated staging of 18 wire pulling locations for a new 230-kV transmission line from Kortsen Road to Thornton Road for the Desert Basin Generating Station, west of Casa Grande in Pinal County. The Class III survey was undertaken to identify, document and evaluate the Arizona/National Register of Historic Places (A/NRHP)...


A Cultural Resources Survey of Approximately 3 Miles for a New SRP 230-kV Transmission Line from Kortsen Road to Thornton Road for the Desert Basin Generating Station, Casa Grande, Pinal County, Arizona (2009)
DOCUMENT Full-Text Jackie L. Orcholl.

SRP requested that Logan Simpson Design (LSD) conduct a Class III cultural resources survey of a new right-of-way (ROW) to determine whether any significant cultural resources will be disturbed by the construction of a 230-kV transmission line. SRP also requested that LSD evaluate portions of four previously recorded sites that are within an existing Western 115-kV transmission line ROW. The new 230-kV transmission line will replace the existing Western line as part of the current project.


Data Recovery Plan for the SRP Browning to Dinosaur 230 kV Transmission Line, Pinal County, AZ (2006)
DOCUMENT Full-Text T. Kathleen Henderson.

Salt River Project (SRP) plans to construct a new 230 kV transmission line between the Browning and Dinosaur substations east of Mesa and Queen Creek, Arizona. A cultural resources survey has determined that portions of three archaeological sites that meet criteria for inclusion on the National Register of Historic Places are present within the transmission line corridor (Henderson 2005). Desert Archaeology, Inc., has prepared this plan at the request of SRP to conduct phased data recovery...


Salt River Project Pinnacle Peak to Papago Buttes Project, Assessment of Cultural Resources (1985)
DOCUMENT Full-Text Richard W. Effland.

Salt River Project (SRP) proposes to construct a 230 kV transmission line to connect the Pinnacle Peak, Brandow, and Papago Buttes substations. Archaeological Consulting Services (ACS) was contracted to perform an assessment of impacts to cultural resources that would be caused by the project. ACS is responsible for assessing potential impacts to historical and archaeological sites as well as architectural resources in the vicinity of the new right-of -way. One hundred percent survey of the...