Cholla-Saguaro Transmission Line (Other Keyword)
1-5 (5 Records)
As a result of a meeting October 4, 1976, with representative from Arizona Public Service, the Southwestern Regional Office of the U.S. Forest Service, Tonto and Apache-Sitgreaves National Forests, and the Arizona State Museum, it was decided that portions of the Cholla to Saguaro 500 kV transmission line should be checked and, if necessary, resurveyed to insure that all archaeological resources within the transmission line corridor are identified. This report concerns the results of checking...
Cholla Project Archaeology, Volume 1, Introduction and Special Studies (1982)
The Arizona Public Service Cholla-Saguaro Transmission Line Mitigation Project, an undertaking as large as its full title suggests, began in April of 1977. The purpose of the Cholla Project was to mitigate construction impacts on prehistoric sites along that portion of the line extending from the Cholla generating plant, near the Little Colorado River, to the upper drainage of Devore Wash, south of Lake Roosevelt, a distance of 135 transmission-line miles. The results of the Cholla Project are...
Cholla Project Archaeology, Volume 2, The Chevelon Region (1982)
The Arizona Public Service Cholla-Saguaro Transmission Line Mitigation Project, an undertaking as large in scope as its full title suggests, began in April of 1977. It is hereafter referred to as Cholla. The project's obvious purpose was to mitigate construction impact on prehistoric sites along that portion of the line extending from the Cholla generating plant near the Little Colorado River to the upper drainage of Devore Wash south of Lake Roosevelt, a distance of 135 transmission-line miles....
Cholla Project Archaeology, Volume 3, The Q Ranch Region (1982)
The Arizona Public Service Cholla-Saguaro Transmission Line Mitigation Project, an undertaking as large in scope as its full title suggests, began in April of 1977. It is hereafter referred to as Cholla. The project's purpose was to mitigate construction impact on prehistoric sites along that portion of the line extending from the Cholla generating plant near the Little Colorado River to the upper drainage of Devore Wash south of Lake Roosevelt, a distance of 135 transmission line miles. This...
Cholla Project Archaeology, Volume 4, The Tonto-Roosevelt Region (1982)
The Arizona Public Service Cholla-Saguaro Transmission Line Mitigation Project, an undertaking as large in scope as its full title suggests, began in April of 1977. It is hereafter referred to as Cholla. The project's obvious purpose was to mitigate construction impacts to prehistoric sites along that portion of the line extending from the Cholla generating plant near the Little Colorado River to the upper drainage of Devore Wash south of Lake Roosevelt, a distance of 135 transmission-line...