No Historic Properties Affected (Other Keyword)

1-8 (8 Records)

Cultural Resource Survey, ML&P Fossil Creek Switchyard and Right-of-Way Corridor, Joint Base Elmendorf-Richardson, Alaska (2013)
DOCUMENT Full-Text Sarah R. Corbin. Mark S. Cassell. Adam C.F. Cox.

This report provides the Bureau of Land Management (BLM) with the results of a cultural resource survey conducted for the proposed Municipal Light & Power Fossil Creek switchyard and right-of-way corridor project on Joint Base Elmendorf-Richardson, Alaska by Territory heritage Resource Consulting (THRC) in July 2012 and July 2013. This document also includes communication between the Bureau of Land Management and the Alaska State Historic Preservation Office.


Joint Base Elmendorf-Richardson Resources
PROJECT Uploaded by: Rachel Fernandez

Project metadata for resources within the Joint Base Elmendorf-Richardson cultural heritage resources collection. This project is used to fill metadata for all resources part of the Joint Base Elmendorf-Richardson collection.


SHPO-CON-230: Re: Section 106 Consultation for Infrastructure Improvements, North Base, Vandenberg Tracking Station, Vandenberg Air Force Base (2017)
DOCUMENT Full-Text Julianne Polanco.

This document is a Section 106 letter from the California State Historic Preservation Office (SHPO) to Vandenberg Air Force Base (Vandenberg AFB) regarding the United States Air Force's (USAF) proposal to upgrade electrical feeder lines B7 and B10 in Vandenberg's north base area and feeder line K5 on Vandenberg's south base. This letter is in response to the transmittal letter of July 25, 2017, initially opening consultation for the project. The letter briefly reiterates information provided in...


SHPO-CON-457: Re: Section 106 Consultation for Repairs to Santa Ynez Ridge Road, Vandenberg Space Force Base, Santa Barbara County (2022)
DOCUMENT Full-Text Julianne Polanco.

This document is a letter from the California State Historic Preservation Office (SHPO) regarding the Santa Ynez Ridge Road Repairs project. The letter briefly reiterates the project activities associated with the project and the cultural resource effort that was performed in support of the Section 106 process. It specifically provides concurrence for the project Area of Potential Effect and the project finding of no historic properties affected.


State Historic Preservation Office Letter: 34.5KV Transmission Line Project on Joint Base Elmendorf Richardson (JBER), Alaska (2016)
DOCUMENT Full-Text Judith E. Bittner.

This document consists of a letter that includes a review of site eligibility for ANC-04284, ANC-04285, and ANC-04286 by the Alaska State Historic Preservation Office.


State Historic Preservation Office Letter: Small Arms Ranges (2010)
DOCUMENT Full-Text Michael E. Schmidt.

This document includes a letter to Ms. Judith Bittner from the Alaska State Historic Preservation Office requesting review of archaeological findings at the Small Arms Ranges located in training areas to the east of the Richardson Highway.


State Historic Preservation Office Letter: Statement of "No Historic Properties Affected" for 34.5KV Electrical Transmission Line Project (2016)
DOCUMENT Full-Text Patrick T. Hall.

Doyon Utilities (Doyon) planned to rebuild an existing 34.5KV above ground feeder line in order to improve the current Joint Base Elmendorf-Richardson (JBER) electrical distribution system. The project would add to the overall capability of the existing 34.5KV line, which could distribute landfill gas facility (LGS) generated power through the JBER electrical grid. Doyon contracted Northern Land Use Research Alaska, LLC (NLURA) to conduct a Phase II cultural resource survey of the proposed right...


State Historic Preservation Office Letter: Undeveloped Area Near Boniface Gate and JBER Training Area 419 Cultural Resource Study (2015)
DOCUMENT Full-Text Brent A. Koenen. Judith E. Bittner.

This document includes a letter from the Alaska State Historic Preservation Office determining that the following sites are not eligible for the National Register of Historic Places (NRHP): At JBER: ANC-04078 and ANC-04079, ANC-04074, ANC-04075, ANC-04076, and ANC-04077.