Determination of Effect (Other Keyword)
1-3 (3 Records)
This Integrated Cultural Resources Management Plan (ICRMP) provides guidance and procedures to enable U.S. Army Alaska (USARAK) to meet its legal responsibilities at Fort Richardson for identification, evaluation, and protection of cultural resources while causing the least disturbance to the military mission. This plan is the implementing document for the cultural resources program on Fort Richardson during 2002-2006. It outlines procedures for cooperation with the Alaska State Historic...
Joint Base Elmendorf-Richardson Resources
Project metadata for resources within the Joint Base Elmendorf-Richardson cultural heritage resources collection. This project is used to fill metadata for all resources part of the Joint Base Elmendorf-Richardson collection.
SHPO-CON-216: Re: Section 106 Consultation for Replace 12 kV Switchgear at Switchyard M Project, Vandenberg AFB (USAF Letter of September 03, 2019 and e-mail of September 12, 2019) (2019)
This document is a Section 106 letter from the California State Historic Preservation Office for the Replace 12kV Switchgear at Switchyard M Project. The letter reiterates the information provided in the transmittal letter from Vandenberg Air Force Base. It provides concurrence for 1) the delineation of the project area of potential effect, and 2) the project finding of no adverse effect to historic properties with conditions. The conditions that will be required during project execution...