Subsistence and Resource-Use Strategies (Other Keyword)

1-2 (2 Records)

A Historic Properties Treatment Plan for Four Prehistoric Sites Along the Salt River Project's Proposed Southeast Power Link 230kV Transmission Line Corridor, Maricopa County, Arizona (2022)
DOCUMENT Full-Text Sebastian Chamorro. Angela Huster.

Salt River Project (SRP) is proposing to construct a new 230kV transmission line in Maricopa County, Arizona (Project). The proposed Project entails the construction of seven miles of new overhead power lines that will follow a previously approved route. The proposed overhead transmission line will require the placement of 56 tubular steel pole structures. The corridor for the proposed Project varies between 100–205 feet (ft) wide. Additionally, a new 230/69kV receiving station will be built in...


A Historic Properties Treatment Plan for Three Prehistoric Sites Along the Salt River Project's Proposed Abel-Pfister-Ball 230kV Transmission Line in the City of Mesa, the Towns of Gilbert and Queen Creek, and the San Tan Valley, Maricopa and Pinal Counties, Arizona (2022)
DOCUMENT Full-Text Lauren Brooks.

*On the title page of this report it says 'draft', however this is the final report. * To meet increased demand for electricity due to growth, SRP plans to construct an approximately 20-mile (mi), double-circuit, 230-kilovolt (kV) transmission line including associated tubular steel pole structures that average 110–140 feet (ft) tall (Project). The Project will connect three 230/69kV receiving stations, including the Ball Substation in Gilbert, the Pfister Substation in southeastern Queen...