an Joaquin Valley (Other Keyword)

1-1 (1 Record)

Over a Decade of Design-Build Archaeology on the California High-Speed Rail, Construction Package 1 from Madera to Fresno, California (2024)
DOCUMENT Citation Only Amanda Harvey. Heather Atherton. Amy MacKinnon. Brett Rushing.

This is an abstract from the "SAA 2024: Individual Abstracts" session, at the 89th annual meeting of the Society for American Archaeology. The California High-Speed Rail Authority (Authority) is responsible for planning, designing, building and operation of the nation’s first high-speed rail system. The high-speed rail system is being built through a series of design-build contracts. Construction Package 1 (CP-1) runs 32 miles from Avenue 19 in Madera County to East American Avenue in Fresno...