Fort Sill (Other Keyword)
1-2 (2 Records)
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Fort Sill Heating, Venting and Air Conditioning (HVAC) Assessment (1998)
Fort Sill asked the US Army Corps of Engineers, St. Louis District to assist them in their efforts to upgrade three buildings as part of the rehabilitation of portions of the Fort Sill Museum. St. Louis District personnel conducted a site visit to evaluate (1) the current heating, venting and air conditioning (HVAC) systems and building structures for Buildings 438 and 442 and (2) the building structures for the addition of an HVAC system in Building 346. Planned building issues, including...