Archaeological Monitoring of Pole Replacement at Salt River Project Structures CP-25 and CP-28 for the Goldfield-Silver King 230kV Project within AZ U:10:49 (ASM)/AZ U:10:2 (BLM), Apache Junction, Maricopa County, Arizona (2009)
DOCUMENT Full-Text Robert A. Rowe. Michael Foster.

This technical memo presents the results of archaeological monitoring by Logan Simpson Design during the installation of Salt River Project (SRP) poles at stations CP-25 and CP-28 along the Goldfield-Silver King 230 kV transmission line within the boundary of AZ U:10:49 (ASM)/AZ U:10:2 (BLM). Because the construction site is located on land administered by the Bureau of Land Management (BLM), the project is considered an undertaking as defined under 36 CFR § 800 (as revised in 2004), the...


Historic Structure Report, CCC Buildings, Bandelier National Monument, New Mexico (1988)
DOCUMENT Citation Only Laura S. Harrison. Randall Copeland. Rodger Buck.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


Phase I Existing Conditions Assessment of Building 5122, Camp Bullis, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 5123, Camp Bullis, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 5907, Camp Bullis, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase II Existing Conditions Assessment of Building 5122, Camp Bullis, Texas (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for...


Phase II Existing Conditions Assessment of Building 5123, Camp Bullis, Texas (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for...


Phase II Existing Conditions Assessment of Building 5907, Camp Bullis, Texas (2010)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for...