Collections Management (Other Keyword)

3,201-3,225 (3,754 Records)

Rubber Artifact Photograph, Archaeological Excavations for the Jenkins House Site (46CB41) 2002-2003 (2002)
IMAGE Veterans Curation Program.

Photograph of rubber artifact collected during the Archaeological Excavations for the Jenkins House Site (46CB41) 2002-2003 in the Robert C. Byrd Locks and Dam area, in Cabell County, West Virginia.


Rucker's Bottom Group 1980-1981
PROJECT US Army Corps of Engineers Mandatory Center of Expertise for the Curation and Management of Archaeological Collections, St. Louis District. Joseph Schuldenrein. David G. Anderson. US Army Corps of Engineers, Savannah District.

This collection is referred to as "Rucker's Bottom Group 1980-1981.” This name is consistent throughout the finding aid, the file folders, and the box labels. The extent of this collection is one (1) linear inch. The documents date from 1970 to 1981. The investigation occurred primarily from 1980 to 1981, which explains the date of the project name. The range of dates includes background information. The documents were originally housed in an acidic manila folder in a cardboard box along with...


Russell County Arbitrary (Multiple) 1969 and N.D.
PROJECT US Army Corps of Engineers Mandatory Center of Expertise for the Curation and Management of Archaeological Collections, St. Louis District. US Army Corps of Engineers, Mobile District.

No reports are present for the Russell County Arbitrary (Multiple) 1969 and N.D Investigations. It is a multi-investigation collection comprised of numerous small investigations. Two of the sites in the Russell County Arbitrary (Multiple) 1969 and N.D. Investigations are mentioned in the Native American Graves Protection and Repatriation Act Preliminary Compliance Report for Ten Sites at Lake Walter F. George, Alabama and Georgia, prepared by Brockington and Associates in 2000 (Atz, et.al....


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013
PROJECT US Army Corps of Engineers, St. Louis District. US Army Corps of Engineers Mandatory Center of Expertise for the Curation and Management of Archaeological Collections, St. Louis District.

This collection is referred to as "Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013.” This name is consistent throughout the finding aid, the file folders, and the box labels. The extent of this collection is one (1) linear inch. There is no final report associated with the document collection, as it does not belong to a typical archaeological investigation. In total there were 25 black and white photographs in good condition, despite some yellowing, residue stains, and...


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0001 (1936)
IMAGE Veterans Curation Program.

Photograph of the Lock Site from the Illinois shore of the Upper Mississippi River, Lock Number 24 during the Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013 archaeological investigation in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0002 (1936)
IMAGE Veterans Curation Program.

Photograph of the Cofferdam construction showing Cross Diaphrams and Driving Template of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0003 (1936)
IMAGE Veterans Curation Program.

Photograph of the view of Cofferdam from top of Bluff of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0004 (1936)
IMAGE Veterans Curation Program.

Photograph of the view of upper end of Cofferdam from top of bluff of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0005 (1936)
IMAGE Veterans Curation Program.

Photograph of the pump at upper riverside cofferdam of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0006 (1936)
IMAGE Veterans Curation Program.

Photograph of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0007 (1937)
IMAGE Veterans Curation Program.

Photograph of Cofferdam, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0008 (1937)
IMAGE Veterans Curation Program.

Photograph of the Upper Mississippi River, Lock Number 24, view of downstream in Cofferdam during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0009 (1937)
IMAGE Veterans Curation Program.

Photograph of the upper guide wall for the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0010 (1937)
IMAGE Veterans Curation Program.

Photograph of the upstream end of Cofferdam of Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0011 (1937)
IMAGE Veterans Curation Program.

Photograph of the general view of Cofferdam from a bluff on the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0012 (1937)
IMAGE Veterans Curation Program.

Photograph of the failure of the steel cut off wall of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0013 (1937)
IMAGE Veterans Curation Program.

Photograph of the a downstream view of the Thru Main Lock of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0014 (1937)
IMAGE Veterans Curation Program.

Photograph of the upstream view showing construction of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0015 (1937)
IMAGE Veterans Curation Program.

Photograph of the upstream nose of interior wall of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0016 (1937)
IMAGE Veterans Curation Program.

Photograph of the form on upstream nose "B" pour intermediate wall of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0017 (1937)
IMAGE Veterans Curation Program.

Photograph of a view of downstream through the main lock of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0018 (1937)
IMAGE Veterans Curation Program.

Photograph of a view of downstream through the main lock of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0019 (1937)
IMAGE Veterans Curation Program.

Photograph of a general view from the bluff of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0020 (1937)
IMAGE Veterans Curation Program.

Photograph of a crane placing top girder on upstream gate of the main lock of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.


Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0021 (1937)
IMAGE Veterans Curation Program.

Photograph of the operating machinery of the Miter Gate of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.