Ash (Other Keyword)
26-26 (26 Records)
Utility Trench Monitoring along the West and North Walls, Fort Union Trading Post National Historic Site, North Dakota (2003)
DOCUMENT
Full-Text
The park plans to upgrade its telephone and alarm system. Trenching along the palisade was required to lay the new utility lines. Archeological monitoring was required since portions of this area were believed not to have been disturbed by previous excavation activity associated with the fort reconstruction work from 1986-1989.