Transmission Line Corridor (Other Keyword)
1-2 (2 Records)
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
West of the Maricopa Mountains: A Cultural Resources Inventory in Support of the Proposed Gila River Transmission Project (2001)
APS proposes to construct (1) two parallel 500 kilovolt (kV) transmission lines within a 450-foot-wide right-of-way, (2) an 80-acre 500kV switchyard, and (3) a 230kV interconnection line in Maricopa County. The project will provide transmission interconnection for the Panda Gila River generating station to the Western Systems Coordinating Council transmission grid.