AZ AA:12:16 (ASM) (Site Name Keyword)

1-3 (3 Records)

Archaeological Investigations at AZ AA:12:16 (ASM), the EK Ranch Site, Pima County, Arizona (2005)
DOCUMENT Full-Text David A. Gregory. James M. Heidke. J. Homer Thiel. Jennifer A. Waters.

In November 1997, Desert Archaeology, Inc., conducted archaeological testing along a portion of AZ AA:12:16 (ASM). According to the Arizona State Museum site card, this Hohokam site was originally recorded by Mitalsky, in 1937. Mitalsky found Hohokam pottery, cremated human bone, and ground stone scattered along the embankments and in adjacent cotton fields. In the years since the site card was filled out, this area has been extensively developed, with little additional archaeological work. ...


Archaeological Survey and Identification Testing Results and Data Recovery Plan for the Proposed Santa Cruz Interceptor: Phases II and IIl (2007)
DOCUMENT Full-Text Joseph Ezzo. David M.R. Barr. S. Jerome Hesse.

Pima County Wastewater Management proposes to construct a sewer line (the Santa Cruz Interceptor [SCI]) along the east bank of the Santa Cruz River. Phase I of this project, has already been completed. Phases II and III will include the installation of a 72-inch-diameter sewer line, manholes, access roads, and other necessary facilities. Under contract with Pima County, SWCA Environmental Consultants (SWCA) conducted an archaeological pedestrian survey and non-site identification testing of the...


Interstate 10 Frontage Road Project: Results of Archaeological Testing and a Plan for Data Recovery at AZ AA:12:91 (ASM) (1995)
DOCUMENT Full-Text David A. Gregory.

The project discussed in this report is part of the Arizona Department of Transportation (ADOT) Improvement Plan for the entire Interstate 10 corridor. A general plan for treatment of cultural resources potentially affected by the overall project has been developed by Desert Archaeology, including a project-wide research design (Mabry 1993a). Ultimately, ADOT plans to construct new frontage roads along both sides of the 1-10 freeway alignment. The current project includes the east side frontage...