AZ T:12:129 (ASM) (Site Name Keyword)
1-3 (3 Records)
This report presents the results of archaeological monitoring for a COP water line project. The project involved the installation of a new waterline along an existing alignment in Phoenix. Archaeological monitoring was conducted under the established Monitoring and Discovery Plan for the city of Phoenix (Montero and Stubing 2004). As a result of the project, five features were recorded and two previously reported sites were given ASM site numbers.
Results of Phased Data Recovery for the Paving and Storm Drain Project, Phoenix, Maricopa County, Arizona (2013)
The City of Phoenix (COP) Street Transportation Department (STD) is conducting road and storm drain improvements. The project will require the relocation of an existing Salt River Project (SRP) irrigation line, located on U.S. Bureau of Reclamation land. Because federal lands are involved, the project is considered a federal undertaking subject to compliance with Section 106 of the National Historic Preservation Act of 1966, as amended. It also follows applicable COP policies and requirements as...
Results of Testing Along The EPNG 2039 Line, Southwest Phoenix, Maricopa County, Arizona (1999)
In June 1999, Archaeological Consulting Services, Ltd. (ACS) surveyed approximately 234 acres of private land for the proposed El Paso Natural Gas Company (EPNG) 2039 pipeline relocation/removal project. AZ T:12:116(ASM}—a previously recorded Hohokam site also known as Pueblo del Rio—was located within the proposed area of impact. ACS concluded that as the site’s integrity and ability to contribute important information about the area’s prehistory were unknown; testing was necessary to evaluate...