Germann Site (Site Name Keyword)

1-3 (3 Records)

Archaeological Testing in a Portion of the Germann Site (AZ U:10:10 [PG]) in Mesa, Maricopa County, Arizona (2006)
DOCUMENT Full-Text Cara Bellavia. Ronald F. Ryden. Douglas R. Mitchell.

This document presents the results of archaeological testing within a portion of the Germann Site (AZ U:10:10 [PG]). The project proponent, North Valley Corp Center, LLC, is planning to develop this parcel. SWCA conducted an archaeological survey of the property in June 2006 (Bellavia and Mitchell 2006a). An approximately 53.7-acre area within site AZ U:10:10 (PG), including a 200 foot buffer off of the site boundary, is located on the property of North Valley Corp Center, LLC. SWCA conducted...


Archaeological Testing in a Portion of the Germann Site (AZ U:10:2 [ASM]) in Queen Creek, Maricopa County, Arizona (2006)
DOCUMENT Full-Text Chris North. Douglas R. Mitchell. Michael S. Foster.

This document presents the results of archaeological testing within a portion of the Germann Site (AZ U:10:2 [ASM]). The project proponent, VIP Homes, is planning to develop this parcel of private land for single-family housing. Nearly the entire project area falls within the mapped boundary of the Germann Site. However, a previous Class III survey of the project area (North, Solometo, and Mitchell 2001) only identified surface artifacts in the northwest portion of the project area. The...


A Historic Properties Treatment Plan for Three Prehistoric Sites Along the Salt River Project's Proposed Abel-Pfister-Ball 230kV Transmission Line in the City of Mesa, the Towns of Gilbert and Queen Creek, and the San Tan Valley, Maricopa and Pinal Counties, Arizona (2022)
DOCUMENT Full-Text Lauren Brooks.

*On the title page of this report it says 'draft', however this is the final report. * To meet increased demand for electricity due to growth, SRP plans to construct an approximately 20-mile (mi), double-circuit, 230-kilovolt (kV) transmission line including associated tubular steel pole structures that average 110–140 feet (ft) tall (Project). The Project will connect three 230/69kV receiving stations, including the Ball Substation in Gilbert, the Pfister Substation in southeastern Queen...