41HE105 (Site Name Keyword)
1-1 (1 Record)
A Reconnaissance Survey of the Trinity River Basin (1978)
DOCUMENT
Full-Text
The current multiple-use plan proposed for the Trinity River, Texas, in the U. S. Army Corps of Engineers Status Report of Environmental Evaluations: 1975 is a modern outgrowth of a long history of navigation proposals beginning in the mid-nineteenth century. As currently developed, the master plan for the 550-mile Trinity River includes four major developmental components: channelization of the river, development of Tennessee Colony Lake, and the construction of two sets of flood way structures...